Optimization interval was [0.0000,950.2915] changed to [0.0000,950.2915]
-----------------------------------------------------------------------
Material manager:

Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
TRUE Material GR is Gravel with quality 3 and cut/fill factor 1.0000/0.9000
TRUE Material GT is Glacial Till with quality 2 and cut/fill factor 1.0000/1.1000
TRUE Material OB is Overburden (Default) with quality 1 and cut/fill factor 1.0000/1.0000
TRUE Material SR is Solid Rock with quality 4 and cut/fill factor 1.0000/0.8000
QUALITY Material q1 is Art. Material with quality 1 and cut/fill factor 1.0000/1.0000
QUALITY Material q2 is Art. Material with quality 2 and cut/fill factor 1.0000/1.0000
QUALITY Material q3 is Art. Material with quality 3 and cut/fill factor 1.0000/1.0000
QUALITY Material q4 is Art. Material with quality 4 and cut/fill factor 1.0000/1.0000
-----------------------------------------------------------------------
Template name: Hor. ROW
Template id: HROW
Soft value 1000000.0000
Unit (int) 1
CONSTRAINT
Template name: Min. Cut
Template id: MCUT
Soft value 1000000.0000
Unit (int) 1
CONSTRAINT
Template name: Min. Fill
Template id: MFILL
Soft value 1000000.0000
Unit (int) 1
CONSTRAINT
Template name: Vert. ROW
Template id: VROW
Soft value 1000000.0000
Unit (int) 1
CONSTRAINT
-----------------------------------------------------------------------
Station manager:

Sampling:

0.0000,1
0.1000,1
5.0000,1
10.0000,1
15.0000,1
20.0000,1
25.0000,1
30.0000,1
35.0000,1
40.0000,1
45.0000,1
50.0000,1
55.0000,1
60.0000,1
65.0000,1
70.0000,1
75.0000,1
80.0000,1
85.0000,1
90.0000,1
95.0000,1
100.0000,1
101.3416,1
105.0000,1
110.0000,1
115.0000,1
120.0000,1
125.0000,1
130.0000,1
135.0000,1
136.0237,1
140.0000,1
145.0000,1
150.0000,1
153.4150,1
155.0000,1
160.0000,1
165.0000,1
170.0000,1
170.8063,1
175.0000,1
180.0000,1
180.0950,1
185.0000,1
190.0000,1
193.4150,1
195.0000,1
200.0000,1
205.0000,1
210.0000,1
215.0000,1
220.0000,1
225.0000,1
230.0000,1
235.0000,1
240.0000,1
245.0000,1
250.0000,1
255.0000,1
260.0000,1
265.0000,1
270.0000,1
275.0000,1
280.0000,1
285.0000,1
290.0000,1
295.0000,1
300.0000,1
305.0000,1
310.0000,1
315.0000,1
320.0000,1
325.0000,1
330.0000,1
335.0000,1
340.0000,1
345.0000,1
346.1140,1
346.3140,1
350.0000,1
355.0000,1
360.0000,1
360.2515,1
362.4235,1
365.0000,1
370.0000,1
375.0000,1
380.0000,1
385.0000,1
390.0000,1
395.0000,1
400.0000,1
405.0000,1
410.0000,1
415.0000,1
420.0000,1
425.0000,1
430.0000,1
435.0000,1
440.0000,1
445.0000,1
445.0320,1
445.2320,1
449.9000,1
450.0000,1
450.1000,1
455.0000,1
460.0000,1
465.0000,1
470.0000,1
474.2781,1
475.0000,1
480.0000,1
485.0000,1
487.5981,1
490.0000,1
495.0000,1
496.8868,1
500.0000,1
505.0000,1
510.0000,1
514.2781,1
515.0000,1
517.3134,1
520.0000,1
525.0000,1
530.0000,1
531.6694,1
535.0000,1
535.4952,1
540.0000,1
545.0000,1
550.0000,1
553.6770,1
555.0000,1
560.0000,1
562.1752,1
565.0000,1
570.0000,1
575.0000,1
575.4952,1
580.0000,1
585.0000,1
590.0000,1
592.7582,1
595.0000,1
596.8382,1
600.0000,1
605.0000,1
610.0000,1
615.0000,1
620.0000,1
625.0000,1
630.0000,1
635.0000,1
640.0000,1
645.0000,1
650.0000,1
655.0000,1
660.0000,1
665.0000,1
670.0000,1
675.0000,1
680.0000,1
685.0000,1
690.0000,1
695.0000,1
700.0000,1
705.0000,1
710.0000,1
715.0000,1
717.6093,1
720.0000,1
725.0000,1
730.0000,1
735.0000,1
740.0000,1
745.0000,1
750.0000,1
753.3053,1
755.0000,1
760.0000,1
765.0000,1
766.6253,1
770.0000,1
775.0000,1
775.1235,1
780.0000,1
785.0000,1
790.0000,1
793.3053,1
795.0000,1
800.0000,1
805.0000,1
810.0000,1
811.4872,1
815.0000,1
820.0000,1
825.0000,1
830.0000,1
835.0000,1
840.0000,1
845.0000,1
850.0000,1
855.0000,1
855.7303,1
860.0000,1
865.0000,1
870.0000,1
875.0000,1
880.0000,1
885.0000,1
890.0000,1
895.0000,1
900.0000,1
905.0000,1
910.0000,1
915.0000,1
920.0000,1
925.0000,1
930.0000,1
934.8294,1
935.0000,1
940.0000,1
945.0000,1
950.0000,1
950.2915,1
Nb active stations: 227/227

-----------------------------------------------------------------------
Station  at Station number 0.0000 and elevation 361.0707 and access distance 0.0000 and center 0.0500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669255.3025 100844.2517 361.0707
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0137,-0.0137]
-0.0137 with fill 0.0000 and cut 3.5818
No fill -9999.0000
Maximum volume cut is 0.3579
Material name: q3
Interval for the levels is : [-0.0137,-0.0137]
-0.0137 with fill 2.5484 and cut 0.0000
Maximum volume fill is 0.2548
No cut -9999.0000
Template id: HROW
-0.0137 9.1375
Template id: MCUT
-0.0137 0.0137
Template id: MFILL
-0.0137 -0.0137
Template id: VROW
-0.0137 1.6507

Station  at Station number 0.1000 and elevation 361.0677 and access distance 0.0000 and center 2.5500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669255.2678 100844.1579 361.0677
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0132,-0.0132]
-0.0132 with fill 0.0000 and cut 3.5765
No fill -9999.0000
Maximum volume cut is 16.9358
Material name: q3
Interval for the levels is : [-0.0132,-0.0132]
-0.0132 with fill 2.5485 and cut 0.0000
Maximum volume fill is 12.4324
No cut -9999.0000
Template id: HROW
-0.0132 9.1373
Template id: MCUT
-0.0132 0.0132
Template id: MFILL
-0.0132 -0.0132
Template id: VROW
-0.0132 1.6506

Station  at Station number 5.0000 and elevation 360.9238 and access distance 0.0000 and center 7.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669253.5647 100839.5634 360.9238
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.0089,0.0089]
0.0089 with fill 0.0000 and cut 3.3361
No fill -9999.0000
Maximum volume cut is 20.2608
Material name: q3
Interval for the levels is : [0.0089,0.0089]
0.0089 with fill 2.5260 and cut 0.0000
Maximum volume fill is 12.7523
No cut -9999.0000
Template id: HROW
0.0089 9.1197
Template id: MCUT
0.0089 -0.0089
Template id: MFILL
0.0089 0.0089
Template id: VROW
0.0089 1.6418

Station  at Station number 10.0000 and elevation 360.7690 and access distance 0.0000 and center 12.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669251.8269 100834.8751 360.7690
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.0394,0.0394]
0.0394 with fill 0.0000 and cut 4.7682
No fill -9999.0000
Maximum volume cut is 23.1213
Material name: q3
Interval for the levels is : [0.0394,0.0394]
0.0394 with fill 2.5750 and cut 0.0000
Maximum volume fill is 12.6749
No cut -9999.0000
Template id: HROW
0.0394 12.0932
Template id: MCUT
0.0394 -0.0394
Template id: MFILL
0.0394 0.0394
Template id: VROW
0.0394 1.6362

Station  at Station number 15.0000 and elevation 360.6091 and access distance 0.0000 and center 17.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669250.0890 100830.1869 360.6091
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.0750,0.0750]
0.0750 with fill 0.0000 and cut 4.4803
No fill -9999.0000
Maximum volume cut is 20.4948
Material name: q3
Interval for the levels is : [0.0750,0.0750]
0.0750 with fill 2.4950 and cut 0.0000
Maximum volume fill is 12.3527
No cut -9999.0000
Template id: HROW
0.0750 11.8722
Template id: MCUT
0.0750 -0.0750
Template id: MFILL
0.0750 0.0750
Template id: VROW
0.0750 1.6456

Station  at Station number 20.0000 and elevation 360.4492 and access distance 0.0000 and center 22.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669248.3512 100825.4986 360.4492
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.1106,0.1106]
0.1106 with fill 0.0000 and cut 3.7176
No fill -9999.0000
Maximum volume cut is 16.3265
Material name: q3
Interval for the levels is : [0.1106,0.1106]
0.1106 with fill 2.4461 and cut 0.0000
Maximum volume fill is 11.7074
No cut -9999.0000
Template id: HROW
0.1106 11.3462
Template id: MCUT
0.1106 -0.1106
Template id: MFILL
0.1106 0.1106
Template id: VROW
0.1106 1.6550

Station  at Station number 25.0000 and elevation 360.2857 and access distance 0.0000 and center 27.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669246.6134 100820.8103 360.2857
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.1497,0.1497]
0.1497 with fill 0.0000 and cut 2.8130
No fill -9999.0000
Maximum volume cut is 13.7095
Material name: q3
Interval for the levels is : [0.1497,0.1497]
0.1497 with fill 2.2369 and cut 0.0000
Maximum volume fill is 10.0838
No cut -9999.0000
Template id: HROW
0.1497 10.7234
Template id: MCUT
0.1497 -0.1497
Template id: MFILL
0.1497 0.1497
Template id: VROW
0.1497 1.6482

Station  at Station number 30.0000 and elevation 360.1309 and access distance 0.0000 and center 32.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669244.8755 100816.1220 360.1309
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.1803,0.1803]
0.1803 with fill 0.0000 and cut 2.6708
No fill -9999.0000
Maximum volume cut is 11.6398
Material name: q3
Interval for the levels is : [0.1803,0.1803]
0.1803 with fill 1.7967 and cut 0.0000
Maximum volume fill is 9.5210
No cut -9999.0000
Template id: HROW
0.1803 10.4352
Template id: MCUT
0.1803 -0.1803
Template id: MFILL
0.1803 0.1803
Template id: VROW
0.1803 1.5012

Station  at Station number 35.0000 and elevation 359.9802 and access distance 0.0000 and center 37.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669243.1377 100811.4338 359.9802
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2067,0.2067]
0.2067 with fill 0.0000 and cut 1.9851
No fill -9999.0000
Maximum volume cut is 7.5913
Material name: q3
Interval for the levels is : [0.2067,0.2067]
0.2067 with fill 2.0117 and cut 0.0000
Maximum volume fill is 10.6769
No cut -9999.0000
Template id: HROW
0.2067 10.4777
Template id: MCUT
0.2067 -0.2067
Template id: MFILL
0.2067 0.2067
Template id: VROW
0.2067 1.4752

Station  at Station number 40.0000 and elevation 359.8295 and access distance 0.0000 and center 42.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669241.3999 100806.7455 359.8295
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2331,0.2331]
0.2331 with fill 0.0000 and cut 1.0514
No fill -9999.0000
Maximum volume cut is 4.6118
Material name: q3
Interval for the levels is : [0.2331,0.2331]
0.2331 with fill 2.2590 and cut 0.0000
Maximum volume fill is 11.7841
No cut -9999.0000
Template id: HROW
0.2331 8.8100
Template id: MCUT
0.2331 -0.2331
Template id: MFILL
0.2331 0.2331
Template id: VROW
0.2331 1.4869

Station  at Station number 45.0000 and elevation 359.6788 and access distance 0.0000 and center 47.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669239.6620 100802.0572 359.6788
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2595,0.2595]
0.2595 with fill 0.0000 and cut 0.7933
No fill -9999.0000
Maximum volume cut is 3.3619
Material name: q3
Interval for the levels is : [0.2595,0.2595]
0.2595 with fill 2.4546 and cut 0.0000
Maximum volume fill is 12.7175
No cut -9999.0000
Template id: HROW
0.2595 8.8627
Template id: MCUT
0.2595 -0.2595
Template id: MFILL
0.2595 0.2595
Template id: VROW
0.2595 1.5133

Station  at Station number 50.0000 and elevation 359.5281 and access distance 0.0000 and center 52.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669237.9242 100797.3689 359.5281
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2859,0.2859]
0.2859 with fill 0.0000 and cut 0.5514
No fill -9999.0000
Maximum volume cut is 2.1944
Material name: q3
Interval for the levels is : [0.2859,0.2859]
0.2859 with fill 2.6324 and cut 0.0000
Maximum volume fill is 13.5611
No cut -9999.0000
Template id: HROW
0.2859 8.9154
Template id: MCUT
0.2859 -0.2859
Template id: MFILL
0.2859 0.2859
Template id: VROW
0.2859 1.5397

Station  at Station number 55.0000 and elevation 359.3774 and access distance 0.0000 and center 57.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669236.1864 100792.6806 359.3774
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3122,0.3122]
0.3122 with fill 0.0000 and cut 0.3263
No fill -9999.0000
Maximum volume cut is 1.1366
Material name: q3
Interval for the levels is : [0.3122,0.3122]
0.3122 with fill 2.7921 and cut 0.0000
Maximum volume fill is 14.2488
No cut -9999.0000
Template id: HROW
0.3122 8.9682
Template id: MCUT
0.3122 -0.3122
Template id: MFILL
0.3122 0.3122
Template id: VROW
0.3122 1.5660

Station  at Station number 60.0000 and elevation 359.2283 and access distance 0.0000 and center 62.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669234.4485 100787.9924 359.2283
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3370,0.3370]
0.3370 with fill 0.0000 and cut 0.1283
No fill -9999.0000
Maximum volume cut is 0.3531
Material name: q3
Interval for the levels is : [0.3370,0.3370]
0.3370 with fill 2.9074 and cut 0.0000
Maximum volume fill is 14.6400
No cut -9999.0000
Template id: HROW
0.3370 8.9648
Template id: MCUT
0.3370 -0.3370
Template id: MFILL
0.3370 0.3370
Template id: VROW
0.3370 1.5644

Station  at Station number 65.0000 and elevation 359.0852 and access distance 0.0000 and center 67.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669232.7107 100783.3041 359.0852
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3558,0.3558]
0.3558 with fill 0.0000 and cut 0.0129
No fill -9999.0000
Maximum volume cut is 0.2672
Material name: q3
Interval for the levels is : [0.3558,0.3558]
0.3558 with fill 2.9486 and cut 0.0000
Maximum volume fill is 15.4302
No cut -9999.0000
Template id: HROW
0.3558 8.9107
Template id: MCUT
0.3558 -0.3558
Template id: MFILL
0.3558 0.3558
Template id: VROW
0.3558 1.5373

Station  at Station number 70.0000 and elevation 358.9444 and access distance 0.0000 and center 72.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669230.9729 100778.6158 358.9444
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3723,0.3723]
0.3723 with fill 0.0000 and cut 0.0940
No fill -9999.0000
Maximum volume cut is 0.5954
Material name: q3
Interval for the levels is : [0.3723,0.3723]
0.3723 with fill 3.2235 and cut 0.0000
Maximum volume fill is 16.9297
No cut -9999.0000
Template id: HROW
0.3723 9.3921
Template id: MCUT
0.3723 -0.3723
Template id: MFILL
0.3723 0.3723
Template id: VROW
0.3723 1.5344

Station  at Station number 75.0000 and elevation 358.8036 and access distance 0.0000 and center 77.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669229.2351 100773.9275 358.8036
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3888,0.3888]
0.3888 with fill 0.0000 and cut 0.1442
No fill -9999.0000
Maximum volume cut is 0.7334
Material name: q3
Interval for the levels is : [0.3888,0.3888]
0.3888 with fill 3.5484 and cut 0.0000
Maximum volume fill is 18.4900
No cut -9999.0000
Template id: HROW
0.3888 9.6636
Template id: MCUT
0.3888 -0.3888
Template id: MFILL
0.3888 0.3888
Template id: VROW
0.3888 1.5647

Station  at Station number 80.0000 and elevation 358.6587 and access distance 0.0000 and center 82.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669227.4972 100769.2393 358.6587
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.4094,0.4094]
0.4094 with fill 0.0000 and cut 0.1491
No fill -9999.0000
Maximum volume cut is 0.4479
Material name: q3
Interval for the levels is : [0.4094,0.4094]
0.4094 with fill 3.8476 and cut 0.0000
Maximum volume fill is 19.6729
No cut -9999.0000
Template id: HROW
0.4094 9.8340
Template id: MCUT
0.4094 -0.4094
Template id: MFILL
0.4094 0.4094
Template id: VROW
0.4094 1.5789

Station  at Station number 85.0000 and elevation 358.5068 and access distance 0.0000 and center 87.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669225.7594 100764.5510 358.5068
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.4370,0.4370]
0.4370 with fill 0.0000 and cut 0.0300
No fill -9999.0000
Maximum volume cut is 0.2041
Material name: q3
Interval for the levels is : [0.4370,0.4370]
0.4370 with fill 4.0216 and cut 0.0000
Maximum volume fill is 20.7811
No cut -9999.0000
Template id: HROW
0.4370 9.4166
Template id: MCUT
0.4370 -0.4370
Template id: MFILL
0.4370 0.4370
Template id: VROW
0.4370 1.5072

Station  at Station number 90.0000 and elevation 358.3569 and access distance 0.0000 and center 92.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669224.0216 100759.8627 358.3569
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.4626,0.4626]
0.4626 with fill 0.0000 and cut 0.0516
No fill -9999.0000
Maximum volume cut is 0.6163
Material name: q3
Interval for the levels is : [0.4626,0.4626]
0.4626 with fill 4.2909 and cut 0.0000
Maximum volume fill is 22.3015
No cut -9999.0000
Template id: HROW
0.4626 10.2223
Template id: MCUT
0.4626 -0.4626
Template id: MFILL
0.4626 0.4626
Template id: VROW
0.4626 1.3488

Station  at Station number 95.0000 and elevation 358.2070 and access distance 0.0000 and center 97.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669222.2837 100755.1744 358.2070
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.4882,0.4882]
0.4882 with fill 0.0000 and cut 0.1949
No fill -9999.0000
Maximum volume cut is 1.3270
Material name: q3
Interval for the levels is : [0.4882,0.4882]
0.4882 with fill 4.6297 and cut 0.0000
Maximum volume fill is 24.4433
No cut -9999.0000
Template id: HROW
0.4882 10.3368
Template id: MCUT
0.4882 -0.4882
Template id: MFILL
0.4882 0.4882
Template id: VROW
0.4882 1.5681

Station  at Station number 100.0000 and elevation 358.0572 and access distance 0.0000 and center 100.6708
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669220.5459 100750.4862 358.0572
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5138,0.5138]
0.5138 with fill 0.0000 and cut 0.3359
No fill -9999.0000
Maximum volume cut is 0.4719
Material name: q3
Interval for the levels is : [0.5138,0.5138]
0.5138 with fill 5.1476 and cut 0.0000
Maximum volume fill is 6.8730
No cut -9999.0000
Template id: HROW
0.5138 10.4513
Template id: MCUT
0.5138 -0.5138
Template id: MFILL
0.5138 0.5138
Template id: VROW
0.5138 1.9648

Station  at Station number 101.3416 and elevation 358.0213 and access distance 0.0000 and center 103.1708
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669220.0796 100749.2282 358.0213
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5163,0.5163]
0.5163 with fill 0.0000 and cut 0.3676
No fill -9999.0000
Maximum volume cut is 1.4846
Material name: q3
Interval for the levels is : [0.5163,0.5163]
0.5163 with fill 5.0985 and cut 0.0000
Maximum volume fill is 18.5885
No cut -9999.0000
Template id: HROW
0.5163 10.4820
Template id: MCUT
0.5163 -0.5163
Template id: MFILL
0.5163 0.5163
Template id: VROW
0.5163 2.0578

Station  at Station number 105.0000 and elevation 357.9267 and access distance 0.0000 and center 107.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669218.8081 100745.7979 357.9267
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5221,0.5221]
0.5221 with fill 0.0000 and cut 0.4440
No fill -9999.0000
Maximum volume cut is 2.4623
Material name: q3
Interval for the levels is : [0.5221,0.5221]
0.5221 with fill 5.0635 and cut 0.0000
Maximum volume fill is 25.9387
No cut -9999.0000
Template id: HROW
0.5221 10.5347
Template id: MCUT
0.5221 -0.5221
Template id: MFILL
0.5221 0.5221
Template id: VROW
0.5221 2.3174

Station  at Station number 110.0000 and elevation 357.8005 and access distance 0.0000 and center 112.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669217.0702 100741.1096 357.8005
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5343,0.5343]
0.5343 with fill 0.0000 and cut 0.5409
No fill -9999.0000
Maximum volume cut is 3.3373
Material name: q3
Interval for the levels is : [0.5343,0.5343]
0.5343 with fill 5.3119 and cut 0.0000
Maximum volume fill is 27.2932
No cut -9999.0000
Template id: HROW
0.5343 11.2184
Template id: MCUT
0.5343 -0.5343
Template id: MFILL
0.5343 0.5343
Template id: VROW
0.5343 2.6911

Station  at Station number 115.0000 and elevation 357.6744 and access distance 0.0000 and center 117.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669215.3324 100736.4213 357.6744
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5547,0.5547]
0.5547 with fill 0.0000 and cut 0.7940
No fill -9999.0000
Maximum volume cut is 4.9983
Material name: q3
Interval for the levels is : [0.5547,0.5547]
0.5547 with fill 5.6053 and cut 0.0000
Maximum volume fill is 27.7195
No cut -9999.0000
Template id: HROW
0.5547 10.9231
Template id: MCUT
0.5547 -0.5547
Template id: MFILL
0.5547 0.5547
Template id: VROW
0.5547 2.5435

Station  at Station number 120.0000 and elevation 357.5913 and access distance 0.0000 and center 122.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669213.5946 100731.7331 357.5913
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5404,0.5404]
0.5404 with fill 0.0000 and cut 1.2053
No fill -9999.0000
Maximum volume cut is 7.4835
Material name: q3
Interval for the levels is : [0.5404,0.5404]
0.5404 with fill 5.4825 and cut 0.0000
Maximum volume fill is 27.2818
No cut -9999.0000
Template id: HROW
0.5404 10.8890
Template id: MCUT
0.5404 -0.5404
Template id: MFILL
0.5404 0.5404
Template id: VROW
0.5404 2.3954

Station  at Station number 125.0000 and elevation 357.4963 and access distance 0.0000 and center 127.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669211.8567 100727.0448 357.4963
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5463,0.5463]
0.5463 with fill 0.0000 and cut 1.7881
No fill -9999.0000
Maximum volume cut is 11.1004
Material name: q3
Interval for the levels is : [0.5463,0.5463]
0.5463 with fill 5.4302 and cut 0.0000
Maximum volume fill is 27.4499
No cut -9999.0000
Template id: HROW
0.5463 11.1403
Template id: MCUT
0.5463 -0.5463
Template id: MFILL
0.5463 0.5463
Template id: VROW
0.5463 2.2540

Station  at Station number 130.0000 and elevation 357.4013 and access distance 0.0000 and center 132.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669210.1189 100722.3565 357.4013
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5606,0.5606]
0.5606 with fill 0.0000 and cut 2.6521
No fill -9999.0000
Maximum volume cut is 16.0820
Material name: q3
Interval for the levels is : [0.5606,0.5606]
0.5606 with fill 5.5497 and cut 0.0000
Maximum volume fill is 28.5576
No cut -9999.0000
Template id: HROW
0.5606 11.3818
Template id: MCUT
0.5606 -0.5606
Template id: MFILL
0.5606 0.5606
Template id: VROW
0.5606 2.1149

Station  at Station number 135.0000 and elevation 357.3063 and access distance 0.0000 and center 135.5119
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669208.3811 100717.6682 357.3063
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5833,0.5833]
0.5833 with fill 0.0000 and cut 3.7807
No fill -9999.0000
Maximum volume cut is 3.9972
Material name: q3
Interval for the levels is : [0.5833,0.5833]
0.5833 with fill 5.8733 and cut 0.0000
Maximum volume fill is 6.0777
No cut -9999.0000
Template id: HROW
0.5833 11.6290
Template id: MCUT
0.5833 -0.5833
Template id: MFILL
0.5833 0.5833
Template id: VROW
0.5833 2.0815

Station  at Station number 136.0237 and elevation 357.2869 and access distance 0.0000 and center 138.0119
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669208.0253 100716.7083 357.2869
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5889,0.5889]
0.5889 with fill 0.0000 and cut 4.0284
No fill -9999.0000
Maximum volume cut is 17.8851
Material name: q3
Interval for the levels is : [0.5889,0.5889]
0.5889 with fill 6.0003 and cut 0.0000
Maximum volume fill is 25.2002
No cut -9999.0000
Template id: HROW
0.5889 11.6824
Template id: MCUT
0.5889 -0.5889
Template id: MFILL
0.5889 0.5889
Template id: VROW
0.5889 2.0870

Station  at Station number 140.0000 and elevation 357.2324 and access distance 0.0000 and center 142.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669206.6432 100712.9799 357.2324
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5932,0.5932]
0.5932 with fill 0.0000 and cut 4.9675
No fill -9999.0000
Maximum volume cut is 27.6784
Material name: q3
Interval for the levels is : [0.5932,0.5932]
0.5932 with fill 6.6749 and cut 0.0000
Maximum volume fill is 35.5521
No cut -9999.0000
Template id: HROW
0.5932 11.8859
Template id: MCUT
0.5932 -0.5932
Template id: MFILL
0.5932 0.5932
Template id: VROW
0.5932 2.1112

Station  at Station number 145.0000 and elevation 357.1725 and access distance 0.0000 and center 147.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669204.9054 100708.2917 357.1725
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.5974,0.5974]
0.5974 with fill 0.0000 and cut 6.1038
No fill -9999.0000
Maximum volume cut is 33.6101
Material name: q3
Interval for the levels is : [0.5974,0.5974]
0.5974 with fill 7.5459 and cut 0.0000
Maximum volume fill is 40.0875
No cut -9999.0000
Template id: HROW
0.5974 12.1918
Template id: MCUT
0.5974 -0.5974
Template id: MFILL
0.5974 0.5974
Template id: VROW
0.5974 2.1488

Station  at Station number 150.0000 and elevation 357.1114 and access distance 0.0000 and center 151.7075
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669203.1676 100703.6034 357.1114
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6111,0.6111]
0.6111 with fill 0.0000 and cut 7.3402
No fill -9999.0000
Maximum volume cut is 26.6508
Material name: q3
Interval for the levels is : [0.6111,0.6111]
0.6111 with fill 8.4891 and cut 0.0000
Maximum volume fill is 30.1349
No cut -9999.0000
Template id: HROW
0.6111 12.6188
Template id: MCUT
0.6111 -0.6111
Template id: MFILL
0.6111 0.6111
Template id: VROW
0.6111 2.1894

Station  at Station number 153.4150 and elevation 357.0660 and access distance 0.0000 and center 154.2075
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669201.9806 100700.4013 357.0660
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6289,0.6289]
0.6289 with fill 0.0000 and cut 8.2677
No fill -9999.0000
Maximum volume cut is 13.4625
Material name: q3
Interval for the levels is : [0.6289,0.6289]
0.6289 with fill 9.1593 and cut 0.0000
Maximum volume fill is 14.8004
No cut -9999.0000
Template id: HROW
0.6289 12.9040
Template id: MCUT
0.6289 -0.6289
Template id: MFILL
0.6289 0.6289
Template id: VROW
0.6289 2.2893

Station  at Station number 155.0000 and elevation 357.0467 and access distance 0.0000 and center 157.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669201.4297 100698.9151 357.0467
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6368,0.6368]
0.6368 with fill 0.0000 and cut 8.7201
No fill -9999.0000
Maximum volume cut is 47.1431
Material name: q3
Interval for the levels is : [0.6368,0.6368]
0.6368 with fill 9.5167 and cut 0.0000
Maximum volume fill is 49.5935
No cut -9999.0000
Template id: HROW
0.6368 13.0347
Template id: MCUT
0.6368 -0.6368
Template id: MFILL
0.6368 0.6368
Template id: VROW
0.6368 2.3988

Station  at Station number 160.0000 and elevation 356.9847 and access distance 0.0000 and center 162.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669199.6919 100694.2268 356.9847
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6680,0.6680]
0.6680 with fill 0.0000 and cut 10.1372
No fill -9999.0000
Maximum volume cut is 49.1902
Material name: q3
Interval for the levels is : [0.6680,0.6680]
0.6680 with fill 10.3207 and cut 0.0000
Maximum volume fill is 51.3025
No cut -9999.0000
Template id: HROW
0.6680 13.2701
Template id: MCUT
0.6680 -0.6680
Template id: MFILL
0.6680 0.6680
Template id: VROW
0.6680 2.7654

Station  at Station number 165.0000 and elevation 356.9227 and access distance 0.0000 and center 167.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669197.9541 100689.5386 356.9227
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7077,0.7077]
0.7077 with fill 0.0000 and cut 9.5389
No fill -9999.0000
Maximum volume cut is 47.2172
Material name: q3
Interval for the levels is : [0.7077,0.7077]
0.7077 with fill 10.2003 and cut 0.0000
Maximum volume fill is 50.5667
No cut -9999.0000
Template id: HROW
0.7077 12.9697
Template id: MCUT
0.7077 -0.7077
Template id: MFILL
0.7077 0.7077
Template id: VROW
0.7077 2.9750

Station  at Station number 170.0000 and elevation 356.8687 and access distance 0.0000 and center 170.4032
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669196.2162 100684.8503 356.8687
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7476,0.7476]
0.7476 with fill 0.0000 and cut 9.3480
No fill -9999.0000
Maximum volume cut is 7.5205
Material name: q3
Interval for the levels is : [0.7476,0.7476]
0.7476 with fill 10.0264 and cut 0.0000
Maximum volume fill is 8.1630
No cut -9999.0000
Template id: HROW
0.7476 12.8983
Template id: MCUT
0.7476 -0.7476
Template id: MFILL
0.7476 0.7476
Template id: VROW
0.7476 2.9186

Station  at Station number 170.8063 and elevation 356.8622 and access distance 0.0000 and center 172.9032
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669195.9360 100684.0942 356.8622
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7526,0.7526]
0.7526 with fill 0.0000 and cut 9.3054
No fill -9999.0000
Maximum volume cut is 39.0605
Material name: q3
Interval for the levels is : [0.7526,0.7526]
0.7526 with fill 10.2208 and cut 0.0000
Maximum volume fill is 44.7923
No cut -9999.0000
Template id: HROW
0.7526 12.8771
Template id: MCUT
0.7526 -0.7526
Template id: MFILL
0.7526 0.7526
Template id: VROW
0.7526 2.9248

Station  at Station number 175.0000 and elevation 356.8294 and access distance 0.0000 and center 177.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669194.4784 100680.1620 356.8294
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7812,0.7812]
0.7812 with fill 0.0000 and cut 9.3229
No fill -9999.0000
Maximum volume cut is 46.2227
Material name: q3
Interval for the levels is : [0.7812,0.7812]
0.7812 with fill 11.1411 and cut 0.0000
Maximum volume fill is 58.5030
No cut -9999.0000
Template id: HROW
0.7812 12.8429
Template id: MCUT
0.7812 -0.7812
Template id: MFILL
0.7812 0.7812
Template id: VROW
0.7812 2.9607

Station  at Station number 180.0000 and elevation 356.7903 and access distance 0.0000 and center 180.0475
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669192.7406 100675.4737 356.7903
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.8229,0.8229]
0.8229 with fill 0.0000 and cut 9.1661
No fill -9999.0000
Maximum volume cut is 0.8708
Material name: q3
Interval for the levels is : [0.8229,0.8229]
0.8229 with fill 12.2601 and cut 0.0000
Maximum volume fill is 1.1662
No cut -9999.0000
Template id: HROW
0.8229 12.7955
Template id: MCUT
0.8229 -0.8229
Template id: MFILL
0.8229 0.8229
Template id: VROW
0.8229 3.0365

Station  at Station number 180.0950 and elevation 356.7896 and access distance 0.0000 and center 182.5475
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669192.7075 100675.3846 356.7896
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.8238,0.8238]
0.8238 with fill 0.0000 and cut 9.1613
No fill -9999.0000
Maximum volume cut is 44.5531
Material name: q3
Interval for the levels is : [0.8238,0.8238]
0.8238 with fill 12.2826 and cut 0.0000
Maximum volume fill is 63.9714
No cut -9999.0000
Template id: HROW
0.8238 12.7945
Template id: MCUT
0.8238 -0.8238
Template id: MFILL
0.8238 0.8238
Template id: VROW
0.8238 3.0382

Station  at Station number 185.0000 and elevation 356.7545 and access distance 0.0000 and center 187.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669191.0431 100670.7708 356.7545
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.8697,0.8697]
0.8697 with fill 0.0000 and cut 9.0052
No fill -9999.0000
Maximum volume cut is 45.1679
Material name: q3
Interval for the levels is : [0.8697,0.8697]
0.8697 with fill 13.8017 and cut 0.0000
Maximum volume fill is 73.3555
No cut -9999.0000
Template id: HROW
0.8697 12.7680
Template id: MCUT
0.8697 -0.8697
Template id: MFILL
0.8697 0.8697
Template id: VROW
0.8697 3.1776

Station  at Station number 190.0000 and elevation 356.7202 and access distance 0.0000 and center 191.7075
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669189.4299 100666.0382 356.7202
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.9233,0.9233]
0.9233 with fill 0.0000 and cut 9.0619
No fill -9999.0000
Maximum volume cut is 31.1442
Material name: q3
Interval for the levels is : [0.9233,0.9233]
0.9233 with fill 15.5405 and cut 0.0000
Maximum volume fill is 55.0309
No cut -9999.0000
Template id: HROW
0.9233 13.7965
Template id: MCUT
0.9233 -0.9233
Template id: MFILL
0.9233 0.9233
Template id: VROW
0.9233 3.6978

Station  at Station number 193.4150 and elevation 356.6959 and access distance 0.0000 and center 194.2075
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669188.3767 100662.7897 356.6959
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.9656,0.9656]
0.9656 with fill 0.0000 and cut 9.1775
No fill -9999.0000
Maximum volume cut is 14.5084
Material name: q3
Interval for the levels is : [0.9656,0.9656]
0.9656 with fill 16.6882 and cut 0.0000
Maximum volume fill is 26.7653
No cut -9999.0000
Template id: HROW
0.9656 13.8118
Template id: MCUT
0.9656 -0.9656
Template id: MFILL
0.9656 0.9656
Template id: VROW
0.9656 3.6869

Station  at Station number 195.0000 and elevation 356.6843 and access distance 0.0000 and center 197.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669187.9014 100661.2776 356.6843
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.9868,0.9868]
0.9868 with fill 0.0000 and cut 9.1299
No fill -9999.0000
Maximum volume cut is 45.5073
Material name: q3
Interval for the levels is : [0.9868,0.9868]
0.9868 with fill 17.0858 and cut 0.0000
Maximum volume fill is 87.9808
No cut -9999.0000
Template id: HROW
0.9868 13.8070
Template id: MCUT
0.9868 -0.9868
Template id: MFILL
0.9868 0.9868
Template id: VROW
0.9868 3.6845

Station  at Station number 200.0000 and elevation 356.6466 and access distance 0.0000 and center 202.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669186.4582 100656.4905 356.6466
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.0605,1.0605]
1.0605 with fill 0.0000 and cut 9.0730
No fill -9999.0000
Maximum volume cut is 45.2837
Material name: q3
Interval for the levels is : [1.0605,1.0605]
1.0605 with fill 18.1065 and cut 0.0000
Maximum volume fill is 92.0259
No cut -9999.0000
Template id: HROW
1.0605 13.8104
Template id: MCUT
1.0605 -1.0605
Template id: MFILL
1.0605 1.0605
Template id: VROW
1.0605 3.6862

Station  at Station number 205.0000 and elevation 356.5944 and access distance 0.0000 and center 207.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669185.1007 100651.6784 356.5944
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.1569,1.1569]
1.1569 with fill 0.0000 and cut 9.0405
No fill -9999.0000
Maximum volume cut is 44.3003
Material name: q3
Interval for the levels is : [1.1569,1.1569]
1.1569 with fill 18.7038 and cut 0.0000
Maximum volume fill is 94.5868
No cut -9999.0000
Template id: HROW
1.1569 14.0793
Template id: MCUT
1.1569 -1.1569
Template id: MFILL
1.1569 1.1569
Template id: VROW
1.1569 3.8207

Station  at Station number 210.0000 and elevation 356.5354 and access distance 0.0000 and center 212.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669183.8293 100646.8428 356.5354
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.2686,1.2686]
1.2686 with fill 0.0000 and cut 8.6796
No fill -9999.0000
Maximum volume cut is 42.6234
Material name: q3
Interval for the levels is : [1.2686,1.2686]
1.2686 with fill 19.1309 and cut 0.0000
Maximum volume fill is 96.2722
No cut -9999.0000
Template id: HROW
1.2686 14.3959
Template id: MCUT
1.2686 -1.2686
Template id: MFILL
1.2686 1.2686
Template id: VROW
1.2686 3.9790

Station  at Station number 215.0000 and elevation 356.4748 and access distance 0.0000 and center 217.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669182.6445 100641.9853 356.4748
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.3902,1.3902]
1.3902 with fill 0.0000 and cut 8.3697
No fill -9999.0000
Maximum volume cut is 41.3627
Material name: q3
Interval for the levels is : [1.3902,1.3902]
1.3902 with fill 19.3780 and cut 0.0000
Maximum volume fill is 97.2668
No cut -9999.0000
Template id: HROW
1.3902 14.4457
Template id: MCUT
1.3902 -1.3902
Template id: MFILL
1.3902 1.3902
Template id: VROW
1.3902 4.0039

Station  at Station number 220.0000 and elevation 356.4149 and access distance 0.0000 and center 222.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669181.5466 100637.1074 356.4149
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.5193,1.5193]
1.5193 with fill 0.0000 and cut 8.1753
No fill -9999.0000
Maximum volume cut is 40.6403
Material name: q3
Interval for the levels is : [1.5193,1.5193]
1.5193 with fill 19.5287 and cut 0.0000
Maximum volume fill is 98.2202
No cut -9999.0000
Template id: HROW
1.5193 14.6121
Template id: MCUT
1.5193 -1.5193
Template id: MFILL
1.5193 1.5193
Template id: VROW
1.5193 4.0871

Station  at Station number 225.0000 and elevation 356.3139 and access distance 0.0000 and center 227.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669180.5360 100632.2107 356.3139
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.6979,1.6979]
1.6979 with fill 0.0000 and cut 8.0808
No fill -9999.0000
Maximum volume cut is 40.0044
Material name: q3
Interval for the levels is : [1.6979,1.6979]
1.6979 with fill 19.7594 and cut 0.0000
Maximum volume fill is 98.8437
No cut -9999.0000
Template id: HROW
1.6979 14.9046
Template id: MCUT
1.6979 -1.6979
Template id: MFILL
1.6979 1.6979
Template id: VROW
1.6979 4.2333

Station  at Station number 230.0000 and elevation 356.1017 and access distance 0.0000 and center 232.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669179.6130 100627.2967 356.1017
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.9961,1.9961]
1.9961 with fill 0.0000 and cut 7.9210
No fill -9999.0000
Maximum volume cut is 38.5020
Material name: q3
Interval for the levels is : [1.9961,1.9961]
1.9961 with fill 19.7781 and cut 0.0000
Maximum volume fill is 100.4083
No cut -9999.0000
Template id: HROW
1.9961 13.6214
Template id: MCUT
1.9961 -1.9961
Template id: MFILL
1.9961 1.9961
Template id: VROW
1.9961 3.5917

Station  at Station number 235.0000 and elevation 355.6494 and access distance 0.0000 and center 237.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669178.7779 100622.3670 355.6494
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [2.5427,2.5427]
2.5427 with fill 0.0000 and cut 7.4798
No fill -9999.0000
Maximum volume cut is 37.2732
Material name: q3
Interval for the levels is : [2.5427,2.5427]
2.5427 with fill 20.3852 and cut 0.0000
Maximum volume fill is 104.5028
No cut -9999.0000
Template id: HROW
2.5427 12.6990
Template id: MCUT
2.5427 -2.5427
Template id: MFILL
2.5427 2.5427
Template id: VROW
2.5427 2.8021

Station  at Station number 240.0000 and elevation 356.1993 and access distance 0.0000 and center 242.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669178.0309 100617.4231 356.1993
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [2.0955,2.0955]
2.0955 with fill 0.0000 and cut 7.4295
No fill -9999.0000
Maximum volume cut is 38.1645
Material name: q3
Interval for the levels is : [2.0955,2.0955]
2.0955 with fill 21.4159 and cut 0.0000
Maximum volume fill is 110.3694
No cut -9999.0000
Template id: HROW
2.0955 12.9253
Template id: MCUT
2.0955 -2.0955
Template id: MFILL
2.0955 2.0955
Template id: VROW
2.0955 2.5672

Station  at Station number 245.0000 and elevation 356.8440 and access distance 0.0000 and center 247.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669177.3723 100612.4668 356.8440
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.5617,1.5617]
1.5617 with fill 0.0000 and cut 7.8363
No fill -9999.0000
Maximum volume cut is 41.1716
Material name: q3
Interval for the levels is : [1.5617,1.5617]
1.5617 with fill 22.7318 and cut 0.0000
Maximum volume fill is 116.5862
No cut -9999.0000
Template id: HROW
1.5617 13.1831
Template id: MCUT
1.5617 -1.5617
Template id: MFILL
1.5617 1.5617
Template id: VROW
1.5617 2.5454

Station  at Station number 250.0000 and elevation 357.3375 and access distance 0.0000 and center 252.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669176.8024 100607.4994 357.3375
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.1875,1.1875]
1.1875 with fill 0.0000 and cut 8.6323
No fill -9999.0000
Maximum volume cut is 45.4663
Material name: q3
Interval for the levels is : [1.1875,1.1875]
1.1875 with fill 23.9027 and cut 0.0000
Maximum volume fill is 120.9070
No cut -9999.0000
Template id: HROW
1.1875 13.4720
Template id: MCUT
1.1875 -1.1875
Template id: MFILL
1.1875 1.1875
Template id: VROW
1.1875 2.6937

Station  at Station number 255.0000 and elevation 357.4773 and access distance 0.0000 and center 257.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669176.3212 100602.5227 357.4773
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.1754,1.1754]
1.1754 with fill 0.0000 and cut 9.5542
No fill -9999.0000
Maximum volume cut is 50.6278
Material name: q3
Interval for the levels is : [1.1754,1.1754]
1.1754 with fill 24.4601 and cut 0.0000
Maximum volume fill is 122.7171
No cut -9999.0000
Template id: HROW
1.1754 13.7261
Template id: MCUT
1.1754 -1.1754
Template id: MFILL
1.1754 1.1754
Template id: VROW
1.1754 2.8534

Station  at Station number 260.0000 and elevation 357.6320 and access distance 0.0000 and center 262.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.9289 100597.5382 357.6320
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.1566,1.1566]
1.1566 with fill 0.0000 and cut 10.6969
No fill -9999.0000
Maximum volume cut is 57.5516
Material name: q3
Interval for the levels is : [1.1566,1.1566]
1.1566 with fill 24.6267 and cut 0.0000
Maximum volume fill is 123.4480
No cut -9999.0000
Template id: HROW
1.1566 13.9821
Template id: MCUT
1.1566 -1.1566
Template id: MFILL
1.1566 1.1566
Template id: VROW
1.1566 3.0295

Station  at Station number 265.0000 and elevation 357.8023 and access distance 0.0000 and center 267.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.6258 100592.5474 357.8023
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 SR 
Material name: GR
Interval for the levels is : [1.1306,1.1306]
1.1306 with fill 0.0000 and cut 12.3237
No fill -9999.0000
Maximum volume cut is 66.9781
Material name: SR
Interval for the levels is : [1.1306,1.1306]
1.1306 with fill 0.0000 and cut 0.0000
No fill -9999.0000
Maximum volume cut is 0.3061
Material name: q3
Interval for the levels is : [1.1306,1.1306]
1.1306 with fill 24.7525 and cut 0.0000
Maximum volume fill is 124.6835
No cut -9999.0000
Template id: HROW
1.1306 14.3338
Template id: MCUT
1.1306 -1.1306
Template id: MFILL
1.1306 1.1306
Template id: VROW
1.1306 3.2241

Station  at Station number 270.0000 and elevation 357.9892 and access distance 0.0000 and center 272.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.4118 100587.5521 357.9892
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.0963,1.0963]
1.0963 with fill 0.0000 and cut 14.4675
No fill -9999.0000
Maximum volume cut is 78.0662
Material name: SR
Interval for the levels is : [1.0963,1.0963]
1.0963 with fill 0.0000 and cut 0.1224
No fill -9999.0000
Maximum volume cut is 1.5832
Material name: q3
Interval for the levels is : [1.0963,1.0963]
1.0963 with fill 25.1209 and cut 0.0000
Maximum volume fill is 125.6695
No cut -9999.0000
Template id: HROW
1.0963 14.7174
Template id: MCUT
1.0963 -1.0963
Template id: MFILL
1.0963 1.0963
Template id: VROW
1.0963 3.4215

Station  at Station number 275.0000 and elevation 358.2164 and access distance 0.0000 and center 277.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.2870 100582.5537 358.2164
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.0301,1.0301]
1.0301 with fill 0.0000 and cut 16.7590
No fill -9999.0000
Maximum volume cut is 89.0143
Material name: SR
Interval for the levels is : [1.0301,1.0301]
1.0301 with fill 0.0000 and cut 0.5108
No fill -9999.0000
Maximum volume cut is 3.7426
Material name: q3
Interval for the levels is : [1.0301,1.0301]
1.0301 with fill 25.1469 and cut 0.0000
Maximum volume fill is 126.6140
No cut -9999.0000
Template id: HROW
1.0301 15.2269
Template id: MCUT
1.0301 -1.0301
Template id: MFILL
1.0301 1.0301
Template id: VROW
1.0301 3.5993

Station  at Station number 280.0000 and elevation 358.3937 and access distance 0.0000 and center 282.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.2515 100577.5539 358.3937
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.0221,1.0221]
1.0221 with fill 0.0000 and cut 18.8467
No fill -9999.0000
Maximum volume cut is 99.9749
Material name: SR
Interval for the levels is : [1.0221,1.0221]
1.0221 with fill 0.0000 and cut 0.9862
No fill -9999.0000
Maximum volume cut is 6.3857
Material name: q3
Interval for the levels is : [1.0221,1.0221]
1.0221 with fill 25.4987 and cut 0.0000
Maximum volume fill is 128.9977
No cut -9999.0000
Template id: HROW
1.0221 15.5968
Template id: MCUT
1.0221 -1.0221
Template id: MFILL
1.0221 1.0221
Template id: VROW
1.0221 3.7973

Station  at Station number 285.0000 and elevation 358.4253 and access distance 0.0000 and center 287.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.3053 100572.5543 358.4253
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.1682,1.1682]
1.1682 with fill 0.0000 and cut 21.1432
No fill -9999.0000
Maximum volume cut is 111.9657
Material name: SR
Interval for the levels is : [1.1682,1.1682]
1.1682 with fill 0.0000 and cut 1.5681
No fill -9999.0000
Maximum volume cut is 9.8050
Material name: q3
Interval for the levels is : [1.1682,1.1682]
1.1682 with fill 26.1004 and cut 0.0000
Maximum volume fill is 131.6345
No cut -9999.0000
Template id: HROW
1.1682 15.9923
Template id: MCUT
1.1682 -1.1682
Template id: MFILL
1.1682 1.1682
Template id: VROW
1.1682 4.0463

Station  at Station number 290.0000 and elevation 358.7050 and access distance 0.0000 and center 292.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.4484 100567.5564 358.7050
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.0743,1.0743]
1.0743 with fill 0.0000 and cut 23.6431
No fill -9999.0000
Maximum volume cut is 121.7267
Material name: SR
Interval for the levels is : [1.0743,1.0743]
1.0743 with fill 0.0000 and cut 2.3539
No fill -9999.0000
Maximum volume cut is 13.4012
Material name: q3
Interval for the levels is : [1.0743,1.0743]
1.0743 with fill 26.5534 and cut 0.0000
Maximum volume fill is 133.0199
No cut -9999.0000
Template id: HROW
1.0743 16.3609
Template id: MCUT
1.0743 -1.0743
Template id: MFILL
1.0743 1.0743
Template id: VROW
1.0743 4.4149

Station  at Station number 295.0000 and elevation 359.0617 and access distance 0.0000 and center 297.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669175.6806 100562.5618 359.0617
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.9120,0.9120]
0.9120 with fill 0.0000 and cut 25.0476
No fill -9999.0000
Maximum volume cut is 125.4875
Material name: SR
Interval for the levels is : [0.9120,0.9120]
0.9120 with fill 0.0000 and cut 3.0065
No fill -9999.0000
Maximum volume cut is 14.2823
Material name: q3
Interval for the levels is : [0.9120,0.9120]
0.9120 with fill 26.6546 and cut 0.0000
Maximum volume fill is 132.5917
No cut -9999.0000
Template id: HROW
0.9120 16.4522
Template id: MCUT
0.9120 -0.9120
Template id: MFILL
0.9120 0.9120
Template id: VROW
0.9120 4.5062

Station  at Station number 300.0000 and elevation 359.4495 and access distance 0.0000 and center 302.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669176.0020 100557.5722 359.4495
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.7268,0.7268]
0.7268 with fill 0.0000 and cut 25.1474
No fill -9999.0000
Maximum volume cut is 123.7037
Material name: SR
Interval for the levels is : [0.7268,0.7268]
0.7268 with fill 0.0000 and cut 2.7064
No fill -9999.0000
Maximum volume cut is 12.9055
Material name: q3
Interval for the levels is : [0.7268,0.7268]
0.7268 with fill 26.3821 and cut 0.0000
Maximum volume fill is 135.4364
No cut -9999.0000
Template id: HROW
0.7268 16.2718
Template id: MCUT
0.7268 -0.7268
Template id: MFILL
0.7268 0.7268
Template id: VROW
0.7268 4.3866

Station  at Station number 305.0000 and elevation 359.6221 and access distance 0.0000 and center 307.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669176.4125 100552.5892 359.6221
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.7651,0.7651]
0.7651 with fill 0.0000 and cut 24.3341
No fill -9999.0000
Maximum volume cut is 118.3040
Material name: SR
Interval for the levels is : [0.7651,0.7651]
0.7651 with fill 0.0000 and cut 2.4558
No fill -9999.0000
Maximum volume cut is 11.8295
Material name: q3
Interval for the levels is : [0.7651,0.7651]
0.7651 with fill 27.7924 and cut 0.0000
Maximum volume fill is 146.7653
No cut -9999.0000
Template id: HROW
0.7651 16.0814
Template id: MCUT
0.7651 -0.7651
Template id: MFILL
0.7651 0.7651
Template id: VROW
0.7651 4.4823

Station  at Station number 310.0000 and elevation 359.7069 and access distance 0.0000 and center 312.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669176.9119 100547.6143 359.7069
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.8996,0.8996]
0.8996 with fill 0.0000 and cut 22.9875
No fill -9999.0000
Maximum volume cut is 110.3211
Material name: SR
Interval for the levels is : [0.8996,0.8996]
0.8996 with fill 0.0000 and cut 2.2760
No fill -9999.0000
Maximum volume cut is 9.8321
Material name: q3
Interval for the levels is : [0.8996,0.8996]
0.8996 with fill 30.9137 and cut 0.0000
Maximum volume fill is 163.9890
No cut -9999.0000
Template id: HROW
0.8996 15.9331
Template id: MCUT
0.8996 -0.8996
Template id: MFILL
0.8996 0.8996
Template id: VROW
0.8996 4.5923

Station  at Station number 315.0000 and elevation 359.9488 and access distance 0.0000 and center 317.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669177.5000 100542.6490 359.9488
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.8853,0.8853]
0.8853 with fill 0.0000 and cut 21.1410
No fill -9999.0000
Maximum volume cut is 95.6850
Material name: SR
Interval for the levels is : [0.8853,0.8853]
0.8853 with fill 0.0000 and cut 1.6569
No fill -9999.0000
Maximum volume cut is 5.3614
Material name: q3
Interval for the levels is : [0.8853,0.8853]
0.8853 with fill 34.6819 and cut 0.0000
Maximum volume fill is 186.1662
No cut -9999.0000
Template id: HROW
0.8853 15.8360
Template id: MCUT
0.8853 -0.8853
Template id: MFILL
0.8853 0.8853
Template id: VROW
0.8853 4.6990

Station  at Station number 320.0000 and elevation 360.0453 and access distance 0.0000 and center 322.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669178.1767 100537.6951 360.0453
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [1.0249,1.0249]
1.0249 with fill 0.0000 and cut 17.1330
No fill -9999.0000
Maximum volume cut is 69.5608
Material name: SR
Interval for the levels is : [1.0249,1.0249]
1.0249 with fill 0.0000 and cut 0.4877
No fill -9999.0000
Maximum volume cut is 1.2192
Material name: q3
Interval for the levels is : [1.0249,1.0249]
1.0249 with fill 39.7846 and cut 0.0000
Maximum volume fill is 219.7209
No cut -9999.0000
Template id: HROW
1.0249 16.0397
Template id: MCUT
1.0249 -1.0249
Template id: MFILL
1.0249 1.0249
Template id: VROW
1.0249 4.8008

Station  at Station number 325.0000 and elevation 360.0031 and access distance 0.0000 and center 327.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669178.9418 100532.7540 360.0031
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.3113,1.3113]
1.3113 with fill 0.0000 and cut 10.6913
No fill -9999.0000
Maximum volume cut is 39.5259
Material name: q3
Interval for the levels is : [1.3113,1.3113]
1.3113 with fill 48.1038 and cut 0.0000
Maximum volume fill is 268.0893
No cut -9999.0000
Template id: HROW
1.3113 16.7506
Template id: MCUT
1.3113 -1.3113
Template id: MFILL
1.3113 1.3113
Template id: VROW
1.3113 5.1563

Station  at Station number 330.0000 and elevation 359.9311 and access distance 0.0000 and center 332.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669179.7949 100527.8274 359.9311
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.6360,1.6360]
1.6360 with fill 0.0000 and cut 5.1190
No fill -9999.0000
Maximum volume cut is 16.8132
Material name: q3
Interval for the levels is : [1.6360,1.6360]
1.6360 with fill 59.1319 and cut 0.0000
Maximum volume fill is 332.3293
No cut -9999.0000
Template id: HROW
1.6360 17.2690
Template id: MCUT
1.6360 -1.6360
Template id: MFILL
1.6360 1.6360
Template id: VROW
1.6360 5.4155

Station  at Station number 335.0000 and elevation 358.4541 and access distance 0.0000 and center 337.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669180.7359 100522.9169 358.4541
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [3.3739,3.3739]
3.3739 with fill 0.0000 and cut 1.6062
No fill -9999.0000
Maximum volume cut is 4.3867
Material name: q3
Interval for the levels is : [3.3739,3.3739]
3.3739 with fill 73.7998 and cut 0.0000
Maximum volume fill is 417.9874
No cut -9999.0000
Template id: HROW
3.3739 19.1280
Template id: MCUT
3.3739 -3.3739
Template id: MFILL
3.3739 3.3739
Template id: VROW
3.3739 6.3450

Station  at Station number 340.0000 and elevation 355.9275 and access distance 0.0000 and center 342.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669181.7644 100518.0238 355.9275
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [6.1698,6.1698]
6.1698 with fill 0.0000 and cut 0.1485
No fill -9999.0000
Maximum volume cut is 0.3712
Material name: q3
Interval for the levels is : [6.1698,6.1698]
6.1698 with fill 93.3951 and cut 0.0000
Maximum volume fill is 519.0256
No cut -9999.0000
Template id: HROW
6.1698 19.9691
Template id: MCUT
6.1698 -6.1698
Template id: MFILL
6.1698 6.1698
Template id: VROW
6.1698 6.7655

Station  at Station number 345.0000 and elevation 356.2246 and access distance 0.0000 and center 345.5570
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669182.8801 100513.1500 356.2246
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [6.1504,6.1504]
6.1504 with fill 114.2151 and cut 0.0000
Maximum volume fill is 130.0240
No cut -9999.0000
Template id: HROW
6.1504 20.7838
Template id: MCUT
6.1504 -6.1504
Template id: MFILL
6.1504 6.1504
Template id: VROW
6.1504 7.1729

Station  at Station number 346.1140 and elevation 356.2868 and access distance 0.0000 and center 346.2140
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669183.1406 100512.0669 356.2868
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 q4 
Material name: q3
Interval for the levels is : [6.1511,6.1511]
6.1511 with fill 119.2212 and cut 0.0000
Maximum volume fill is 11.9221
No cut -9999.0000
Material name: q4
Interval for the levels is : [6.1511,6.1511]
6.1511 with fill 0.0000 and cut 0.0000
Maximum volume fill is 9.8106
No cut -9999.0000
Template id: HROW
6.1511 20.9339
Template id: MCUT
6.1511 -6.1511
Template id: MFILL
6.1511 6.1511
Template id: VROW
6.1511 7.2480

Station  at Station number 346.3140 and elevation 356.2991 and access distance 0.0000 and center 348.1570
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669183.1878 100511.8725 356.2991
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.1502,6.1502]
6.1502 with fill 98.1059 and cut 0.0000
Maximum volume fill is 386.4022
No cut -9999.0000
Template id: HROW
6.1502 13.3236
Template id: MCUT
6.1502 -6.1502
Template id: MFILL
6.1502 6.1502
Template id: VROW
6.1502 6.4700

Station  at Station number 350.0000 and elevation 356.5228 and access distance 0.0000 and center 352.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669184.0827 100508.2968 356.5228
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.1381,6.1381]
6.1381 with fill 111.5534 and cut 0.0000
Maximum volume fill is 595.0873
No cut -9999.0000
Template id: HROW
6.1381 13.6165
Template id: MCUT
6.1381 -6.1381
Template id: MFILL
6.1381 6.1381
Template id: VROW
6.1381 6.7629

Station  at Station number 355.0000 and elevation 356.8256 and access distance 0.0000 and center 357.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669185.3718 100503.4659 356.8256
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.1296,6.1296]
6.1296 with fill 126.4815 and cut 0.0000
Maximum volume fill is 661.2153
No cut -9999.0000
Template id: HROW
6.1296 14.1010
Template id: MCUT
6.1296 -6.1296
Template id: MFILL
6.1296 6.1296
Template id: VROW
6.1296 7.2474

Station  at Station number 360.0000 and elevation 356.9615 and access distance 0.0000 and center 360.1258
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669186.7469 100498.6588 356.9615
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.2963,6.2963]
6.2963 with fill 138.0047 and cut 0.0000
Maximum volume fill is 34.7768
No cut -9999.0000
Template id: HROW
6.2963 14.7620
Template id: MCUT
6.2963 -6.2963
Template id: MFILL
6.2963 6.2963
Template id: VROW
6.2963 7.9084

Station  at Station number 360.2515 and elevation 356.9586 and access distance 0.0000 and center 361.3375
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669186.8183 100498.4176 356.9586
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.3147,6.3147]
6.3147 with fill 138.5005 and cut 0.0000
Maximum volume fill is 305.6975
No cut -9999.0000
Template id: HROW
6.3147 14.7960
Template id: MCUT
6.3147 -6.3147
Template id: MFILL
6.3147 6.3147
Template id: VROW
6.3147 7.9424

Station  at Station number 362.4235 and elevation 356.9334 and access distance 0.0000 and center 363.7117
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669187.4442 100496.3378 356.9334
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [6.4733,6.4733]
6.4733 with fill 142.9976 and cut 0.0000
Maximum volume fill is 376.6762
No cut -9999.0000
Template id: HROW
6.4733 15.0891
Template id: MCUT
6.4733 -6.4733
Template id: MFILL
6.4733 6.4733
Template id: VROW
6.4733 8.2355

Station  at Station number 365.0000 and elevation 356.4592 and access distance 0.0000 and center 367.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669188.2076 100493.8770 356.4592
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [7.1048,7.1048]
7.1048 with fill 149.3937 and cut 0.0000
Maximum volume fill is 786.1486
No cut -9999.0000
Template id: HROW
7.1048 15.4336
Template id: MCUT
7.1048 -7.1048
Template id: MFILL
7.1048 7.1048
Template id: VROW
7.1048 8.5800

Station  at Station number 370.0000 and elevation 356.0290 and access distance 0.0000 and center 372.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669189.7535 100489.1220 356.0290
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [7.8337,7.8337]
7.8337 with fill 165.0657 and cut 0.0000
Maximum volume fill is 883.3134
No cut -9999.0000
Template id: HROW
7.8337 16.0891
Template id: MCUT
7.8337 -7.8337
Template id: MFILL
7.8337 7.8337
Template id: VROW
7.8337 9.2355

Station  at Station number 375.0000 and elevation 355.4667 and access distance 0.0000 and center 377.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669191.3840 100484.3954 355.4667
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [8.6864,8.6864]
8.6864 with fill 188.2596 and cut 0.0000
Maximum volume fill is 1017.6717
No cut -9999.0000
Template id: HROW
8.6864 16.7393
Template id: MCUT
8.6864 -8.6864
Template id: MFILL
8.6864 8.6864
Template id: VROW
8.6864 9.8857

Station  at Station number 380.0000 and elevation 354.8251 and access distance 0.0000 and center 382.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669193.0987 100479.6987 354.8251
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [9.6101,9.6101]
9.6101 with fill 218.8090 and cut 0.0000
Maximum volume fill is 1173.1693
No cut -9999.0000
Template id: HROW
9.6101 17.4944
Template id: MCUT
9.6101 -9.6101
Template id: MFILL
9.6101 9.6101
Template id: VROW
9.6101 10.6408

Station  at Station number 385.0000 and elevation 354.4435 and access distance 0.0000 and center 387.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669194.8969 100475.0334 354.4435
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [10.2655,10.2655]
10.2655 with fill 250.4587 and cut 0.0000
Maximum volume fill is 1325.9642
No cut -9999.0000
Template id: HROW
10.2655 18.3464
Template id: MCUT
10.2655 -10.2655
Template id: MFILL
10.2655 10.2655
Template id: VROW
10.2655 11.4929

Station  at Station number 390.0000 and elevation 353.9906 and access distance 0.0000 and center 392.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669196.7782 100470.4009 353.9906
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [10.9838,10.9838]
10.9838 with fill 279.9270 and cut 0.0000
Maximum volume fill is 1464.3235
No cut -9999.0000
Template id: HROW
10.9838 19.0380
Template id: MCUT
10.9838 -10.9838
Template id: MFILL
10.9838 10.9838
Template id: VROW
10.9838 12.1844

Station  at Station number 395.0000 and elevation 353.4423 and access distance 0.0000 and center 397.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669198.7419 100465.8027 353.4423
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [11.7892,11.7892]
11.7892 with fill 305.8024 and cut 0.0000
Maximum volume fill is 1575.0429
No cut -9999.0000
Template id: HROW
11.7892 19.5770
Template id: MCUT
11.7892 -11.7892
Template id: MFILL
11.7892 11.7892
Template id: VROW
11.7892 12.7234

Station  at Station number 400.0000 and elevation 353.0876 and access distance 0.0000 and center 402.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669200.7874 100461.2403 353.0876
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [12.3926,12.3926]
12.3926 with fill 324.2147 and cut 0.0000
Maximum volume fill is 1668.5883
No cut -9999.0000
Template id: HROW
12.3926 20.1632
Template id: MCUT
12.3926 -12.3926
Template id: MFILL
12.3926 12.3926
Template id: VROW
12.3926 13.3096

Station  at Station number 405.0000 and elevation 353.3554 and access distance 0.0000 and center 407.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669202.9140 100456.7152 353.3554
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [12.3652,12.3652]
12.3652 with fill 343.2206 and cut 0.0000
Maximum volume fill is 1756.2776
No cut -9999.0000
Template id: HROW
12.3652 20.5125
Template id: MCUT
12.3652 -12.3652
Template id: MFILL
12.3652 12.3652
Template id: VROW
12.3652 13.1361

Station  at Station number 410.0000 and elevation 353.6262 and access distance 0.0000 and center 412.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669205.1211 100452.2287 353.6262
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [12.3264,12.3264]
12.3264 with fill 359.2905 and cut 0.0000
Maximum volume fill is 1768.6016
No cut -9999.0000
Template id: HROW
12.3264 22.1407
Template id: MCUT
12.3264 -12.3264
Template id: MFILL
12.3264 12.3264
Template id: VROW
12.3264 12.8754

Station  at Station number 415.0000 and elevation 354.0612 and access distance 0.0000 and center 417.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669207.4080 100447.7824 354.0612
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [12.1152,12.1152]
12.1152 with fill 348.1501 and cut 0.0000
Maximum volume fill is 1626.8375
No cut -9999.0000
Template id: HROW
12.1152 21.9396
Template id: MCUT
12.1152 -12.1152
Template id: MFILL
12.1152 12.1152
Template id: VROW
12.1152 12.3679

Station  at Station number 420.0000 and elevation 355.4149 and access distance 0.0000 and center 422.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669209.7739 100443.3777 355.4149
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [10.9770,10.9770]
10.9770 with fill 302.5849 and cut 0.0000
Maximum volume fill is 1390.1194
No cut -9999.0000
Template id: HROW
10.9770 21.2227
Template id: MCUT
10.9770 -10.9770
Template id: MFILL
10.9770 10.9770
Template id: VROW
10.9770 11.1585

Station  at Station number 425.0000 and elevation 356.9346 and access distance 0.0000 and center 427.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669212.2180 100439.0159 356.9346
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [9.6644,9.6644]
9.6644 with fill 253.4629 and cut 0.0000
Maximum volume fill is 1149.4855
No cut -9999.0000
Template id: HROW
9.6644 20.2089
Template id: MCUT
9.6644 -9.6644
Template id: MFILL
9.6644 9.6644
Template id: VROW
9.6644 10.1448

Station  at Station number 430.0000 and elevation 358.5204 and access distance 0.0000 and center 432.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669214.7397 100434.6984 358.5204
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [8.2773,8.2773]
8.2773 with fill 206.3313 and cut 0.0000
Maximum volume fill is 928.2630
No cut -9999.0000
Template id: HROW
8.2773 19.1349
Template id: MCUT
8.2773 -8.2773
Template id: MFILL
8.2773 8.2773
Template id: VROW
8.2773 9.0708

Station  at Station number 435.0000 and elevation 359.9697 and access distance 0.0000 and center 437.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669217.3380 100430.4266 359.9697
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [7.0185,7.0185]
7.0185 with fill 164.9739 and cut 0.0000
Maximum volume fill is 731.3309
No cut -9999.0000
Template id: HROW
7.0185 17.9879
Template id: MCUT
7.0185 -7.0185
Template id: MFILL
7.0185 7.0185
Template id: VROW
7.0185 7.9237

Station  at Station number 440.0000 and elevation 361.4389 and access distance 0.0000 and center 442.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669220.0122 100426.2019 361.4389
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [5.7313,5.7313]
5.7313 with fill 127.5584 and cut 0.0000
Maximum volume fill is 550.9318
No cut -9999.0000
Template id: HROW
5.7313 16.8281
Template id: MCUT
5.7313 -5.7313
Template id: MFILL
5.7313 5.7313
Template id: VROW
5.7313 6.7639

Station  at Station number 445.0000 and elevation 362.9056 and access distance 0.0000 and center 445.0160
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669222.7614 100422.0257 362.9056
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 
Material name: q4
Interval for the levels is : [4.4383,4.4383]
4.4383 with fill 92.8143 and cut 0.0000
Maximum volume fill is 2.9666
No cut -9999.0000
Template id: HROW
4.4383 15.6717
Template id: MCUT
4.4383 -4.4383
Template id: MFILL
4.4383 4.4383
Template id: VROW
4.4383 5.6075

Station  at Station number 445.0320 and elevation 362.9150 and access distance 0.0000 and center 445.1320
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669222.7793 100421.9991 362.9150
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q4 q3 
Material name: q3
Interval for the levels is : [4.4301,4.4301]
4.4301 with fill 0.0000 and cut 0.0000
Maximum volume fill is 10.7583
No cut -9999.0000
Material name: q4
Interval for the levels is : [4.4301,4.4301]
4.4301 with fill 92.6012 and cut 0.0000
Maximum volume fill is 9.2601
No cut -9999.0000
Template id: HROW
4.4301 15.6643
Template id: MCUT
4.4301 -4.4301
Template id: MFILL
4.4301 4.4301
Template id: VROW
4.4301 5.6002

Station  at Station number 445.2320 and elevation 362.9736 and access distance 0.0000 and center 447.5660
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669222.8908 100421.8331 362.9736
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.3783,4.3783]
4.3783 with fill 107.5829 and cut 0.0000
Maximum volume fill is 417.1998
No cut -9999.0000
Template id: HROW
4.3783 20.4820
Template id: MCUT
4.3783 -4.3783
Template id: MFILL
4.3783 4.3783
Template id: VROW
4.3783 5.8447

Station  at Station number 449.9000 and elevation 364.2818 and access distance 0.0000 and center 449.9500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669225.5276 100417.9812 364.2818
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.2243,3.2243]
3.2243 with fill 71.1659 and cut 0.0000
Maximum volume fill is 7.0805
No cut -9999.0000
Template id: HROW
3.2243 18.2431
Template id: MCUT
3.2243 -3.2243
Template id: MFILL
3.2243 3.2243
Template id: VROW
3.2243 4.7252

Station  at Station number 450.0000 and elevation 364.3096 and access distance 0.0000 and center 450.0500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669225.5848 100417.8992 364.3096
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.1998,3.1998]
3.1998 with fill 70.4442 and cut 0.0000
Maximum volume fill is 7.0084
No cut -9999.0000
Template id: HROW
3.1998 18.1946
Template id: MCUT
3.1998 -3.1998
Template id: MFILL
3.1998 3.1998
Template id: VROW
3.1998 4.7010

Station  at Station number 450.1000 and elevation 364.3374 and access distance 0.0000 and center 452.5500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669225.6420 100417.8172 364.3374
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.1752,3.1752]
3.1752 with fill 69.7247 and cut 0.0000
Maximum volume fill is 261.7696
No cut -9999.0000
Template id: HROW
3.1752 18.1461
Template id: MCUT
3.1752 -3.1752
Template id: MFILL
3.1752 3.1752
Template id: VROW
3.1752 4.6767

Station  at Station number 455.0000 and elevation 365.6967 and access distance 0.0000 and center 457.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669228.4814 100413.8238 365.6967
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 GR 
Material name: GR
Interval for the levels is : [1.9698,1.9698]
1.9698 with fill 0.0000 and cut 0.0000
No fill -9999.0000
Maximum volume cut is 1.6841
Material name: q3
Interval for the levels is : [1.9698,1.9698]
1.9698 with fill 37.1201 and cut 0.0000
Maximum volume fill is 115.5487
No cut -9999.0000
Template id: HROW
1.9698 15.7397
Template id: MCUT
1.9698 -1.9698
Template id: MFILL
1.9698 1.9698
Template id: VROW
1.9698 3.4735

Station  at Station number 460.0000 and elevation 367.0776 and access distance 0.0000 and center 462.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669231.4503 100409.8007 367.0776
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7376,0.7376]
0.7376 with fill 0.0000 and cut 0.6737
No fill -9999.0000
Maximum volume cut is 59.5317
Material name: q3
Interval for the levels is : [0.7376,0.7376]
0.7376 with fill 9.0994 and cut 0.0000
Maximum volume fill is 22.7486
No cut -9999.0000
Template id: HROW
0.7376 13.0753
Template id: MCUT
0.7376 -0.7376
Template id: MFILL
0.7376 0.7376
Template id: VROW
0.7376 2.1413

Station  at Station number 465.0000 and elevation 368.5149 and access distance 0.0000 and center 467.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669234.4905 100405.8313 368.5149
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.5592,-0.5592]
-0.5592 with fill 0.0000 and cut 23.1390
No fill -9999.0000
Maximum volume cut is 202.4139
Material name: SR
Interval for the levels is : [-0.5592,-0.5592]
-0.5592 with fill 0.0000 and cut 0.0000
No fill -9999.0000
Maximum volume cut is 2.8756
Template id: HROW
-0.5592 14.5366
Template id: MCUT
-0.5592 0.5592
Template id: MFILL
-0.5592 -0.5592
Template id: VROW
-0.5592 1.0765

Station  at Station number 470.0000 and elevation 369.9578 and access distance 0.0000 and center 472.1390
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669237.6012 100401.9168 369.9578
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-1.8701,-1.8701]
-1.8701 with fill 0.0000 and cut 57.8265
No fill -9999.0000
Maximum volume cut is 280.7314
Material name: SR
Interval for the levels is : [-1.8701,-1.8701]
-1.8701 with fill 0.0000 and cut 1.1502
No fill -9999.0000
Maximum volume cut is 37.0751
Template id: HROW
-1.8701 15.5554
Template id: MCUT
-1.8701 1.8701
Template id: MFILL
-1.8701 -1.8701
Template id: VROW
-1.8701 2.6256

Station  at Station number 474.2781 and elevation 371.1751 and access distance 0.0000 and center 474.6390
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669240.3179 100398.6120 371.1751
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-2.9810,-2.9810]
-2.9810 with fill 0.0000 and cut 73.4149
No fill -9999.0000
Maximum volume cut is 53.3443
Material name: SR
Interval for the levels is : [-2.9810,-2.9810]
-2.9810 with fill 0.0000 and cut 16.1823
No fill -9999.0000
Maximum volume cut is 13.1355
Template id: HROW
-2.9810 16.2977
Template id: MCUT
-2.9810 2.9810
Template id: MFILL
-2.9810 -2.9810
Template id: VROW
-2.9810 3.9260

Station  at Station number 475.0000 and elevation 371.3608 and access distance 0.0000 and center 477.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669240.7813 100398.0585 371.3608
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-3.1493,-3.1493]
-3.1493 with fill 0.0000 and cut 74.3719
No fill -9999.0000
Maximum volume cut is 386.8208
Material name: SR
Interval for the levels is : [-3.1493,-3.1493]
-3.1493 with fill 0.0000 and cut 20.2086
No fill -9999.0000
Maximum volume cut is 175.8288
Template id: HROW
-3.1493 16.3995
Template id: MCUT
-3.1493 3.1493
Template id: MFILL
-3.1493 -3.1493
Template id: VROW
-3.1493 4.1464

Station  at Station number 480.0000 and elevation 372.6422 and access distance 0.0000 and center 482.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669244.0297 100394.2576 372.6422
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-4.3153,-4.3153]
-4.3153 with fill 0.0000 and cut 80.3564
No fill -9999.0000
Maximum volume cut is 416.8253
Material name: SR
Interval for the levels is : [-4.3153,-4.3153]
-4.3153 with fill 0.0000 and cut 50.1229
No fill -9999.0000
Maximum volume cut is 331.1821
Template id: HROW
-4.3153 17.1028
Template id: MCUT
-4.3153 4.3153
Template id: MFILL
-4.3153 -4.3153
Template id: VROW
-4.3153 5.6823

Station  at Station number 485.0000 and elevation 373.8776 and access distance 0.0000 and center 486.2990
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669247.3455 100390.5153 373.8776
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-5.4437,-5.4437]
-5.4437 with fill 0.0000 and cut 86.3737
No fill -9999.0000
Maximum volume cut is 228.1470
Material name: SR
Interval for the levels is : [-5.4437,-5.4437]
-5.4437 with fill 0.0000 and cut 82.3500
No fill -9999.0000
Maximum volume cut is 236.7537
Template id: HROW
-5.4437 18.0673
Template id: MCUT
-5.4437 5.4437
Template id: MFILL
-5.4437 -5.4437
Template id: VROW
-5.4437 7.2354

Station  at Station number 487.5981 and elevation 374.4694 and access distance 0.0000 and center 488.7990
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669249.0947 100388.5942 374.4694
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-5.9831,-5.9831]
-5.9831 with fill 0.0000 and cut 89.2529
No fill -9999.0000
Maximum volume cut is 216.9027
Material name: SR
Interval for the levels is : [-5.9831,-5.9831]
-5.9831 with fill 0.0000 and cut 99.9021
No fill -9999.0000
Maximum volume cut is 257.6788
Template id: HROW
-5.9831 18.7700
Template id: MCUT
-5.9831 5.9831
Template id: MFILL
-5.9831 -5.9831
Template id: VROW
-5.9831 7.9017

Station  at Station number 490.0000 and elevation 374.9724 and access distance 0.0000 and center 492.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669250.7200 100386.8258 374.9724
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-6.4397,-6.4397]
-6.4397 with fill 0.0000 and cut 91.3557
No fill -9999.0000
Maximum volume cut is 457.0751
Material name: SR
Interval for the levels is : [-6.4397,-6.4397]
-6.4397 with fill 0.0000 and cut 114.6596
No fill -9999.0000
Maximum volume cut is 630.5457
Template id: HROW
-6.4397 19.2042
Template id: MCUT
-6.4397 6.4397
Template id: MFILL
-6.4397 -6.4397
Template id: VROW
-6.4397 8.3019

Station  at Station number 495.0000 and elevation 375.8100 and access distance 0.0000 and center 495.9434
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669254.1034 100383.1444 375.8100
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-7.1869,-7.1869]
-7.1869 with fill 0.0000 and cut 91.4743
No fill -9999.0000
Maximum volume cut is 172.6328
Material name: SR
Interval for the levels is : [-7.1869,-7.1869]
-7.1869 with fill 0.0000 and cut 137.5586
No fill -9999.0000
Maximum volume cut is 266.6703
Template id: HROW
-7.1869 20.1078
Template id: MCUT
-7.1869 7.1869
Template id: MFILL
-7.1869 -7.1869
Template id: VROW
-7.1869 9.1338

Station  at Station number 496.8868 and elevation 376.0851 and access distance 0.0000 and center 498.4434
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669255.3802 100381.7552 376.0851
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-7.4300,-7.4300]
-7.4300 with fill 0.0000 and cut 91.5169
No fill -9999.0000
Maximum volume cut is 285.1777
Material name: SR
Interval for the levels is : [-7.4300,-7.4300]
-7.4300 with fill 0.0000 and cut 145.1127
No fill -9999.0000
Maximum volume cut is 469.6412
Template id: HROW
-7.4300 20.4516
Template id: MCUT
-7.4300 7.4300
Template id: MFILL
-7.4300 -7.4300
Template id: VROW
-7.4300 9.4502

Station  at Station number 500.0000 and elevation 376.5446 and access distance 0.0000 and center 502.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669257.4869 100379.4631 376.5446
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-7.8394,-7.8394]
-7.8394 with fill 0.0000 and cut 91.6878
No fill -9999.0000
Maximum volume cut is 465.9263
Material name: SR
Interval for the levels is : [-7.8394,-7.8394]
-7.8394 with fill 0.0000 and cut 156.5957
No fill -9999.0000
Maximum volume cut is 837.7337
Template id: HROW
-7.8394 21.0221
Template id: MCUT
-7.8394 7.8394
Template id: MFILL
-7.8394 -7.8394
Template id: VROW
-7.8394 9.9751

Station  at Station number 505.0000 and elevation 377.3067 and access distance 0.0000 and center 507.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669260.8703 100375.7817 377.3067
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-8.5277,-8.5277]
-8.5277 with fill 0.0000 and cut 94.6827
No fill -9999.0000
Maximum volume cut is 480.6116
Material name: SR
Interval for the levels is : [-8.5277,-8.5277]
-8.5277 with fill 0.0000 and cut 178.4977
No fill -9999.0000
Maximum volume cut is 938.1645
Template id: HROW
-8.5277 21.6073
Template id: MCUT
-8.5277 8.5277
Template id: MFILL
-8.5277 -8.5277
Template id: VROW
-8.5277 10.4860

Station  at Station number 510.0000 and elevation 377.9734 and access distance 0.0000 and center 512.1390
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669264.2537 100372.1003 377.9734
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.1290,-9.1290]
-9.1290 with fill 0.0000 and cut 97.5620
No fill -9999.0000
Maximum volume cut is 421.3170
Material name: SR
Interval for the levels is : [-9.1290,-9.1290]
-9.1290 with fill 0.0000 and cut 196.7680
No fill -9999.0000
Maximum volume cut is 863.1430
Template id: HROW
-9.1290 22.1838
Template id: MCUT
-9.1290 9.1290
Template id: MFILL
-9.1290 -9.1290
Template id: VROW
-9.1290 10.9866

Station  at Station number 514.2781 and elevation 378.2826 and access distance 0.0000 and center 514.6390
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669267.1486 100368.9505 378.2826
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.3889,-9.3889]
-9.3889 with fill 0.0000 and cut 99.4030
No fill -9999.0000
Maximum volume cut is 71.8730
Material name: SR
Interval for the levels is : [-9.3889,-9.3889]
-9.3889 with fill 0.0000 and cut 206.7497
No fill -9999.0000
Maximum volume cut is 149.8511
Template id: HROW
-9.3889 22.6618
Template id: MCUT
-9.3889 9.3889
Template id: MFILL
-9.3889 -9.3889
Template id: VROW
-9.3889 11.3985

Station  at Station number 515.0000 and elevation 378.3348 and access distance 0.0000 and center 516.1567
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669267.6371 100368.4190 378.3348
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.4333,-9.4333]
-9.4333 with fill 0.0000 and cut 99.7165
No fill -9999.0000
Maximum volume cut is 231.4853
Material name: SR
Interval for the levels is : [-9.4333,-9.4333]
-9.4333 with fill 0.0000 and cut 208.4029
No fill -9999.0000
Maximum volume cut is 488.1476
Template id: HROW
-9.4333 22.7385
Template id: MCUT
-9.4333 9.4333
Template id: MFILL
-9.4333 -9.4333
Template id: VROW
-9.4333 11.4639

Station  at Station number 517.3134 and elevation 378.4699 and access distance 0.0000 and center 518.6567
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669269.2026 100366.7157 378.4699
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.5448,-9.5448]
-9.5448 with fill 0.0000 and cut 100.4129
No fill -9999.0000
Maximum volume cut is 270.0967
Material name: SR
Interval for the levels is : [-9.5448,-9.5448]
-9.5448 with fill 0.0000 and cut 213.6224
No fill -9999.0000
Maximum volume cut is 581.2100
Template id: HROW
-9.5448 22.8855
Template id: MCUT
-9.5448 9.5448
Template id: MFILL
-9.5448 -9.5448
Template id: VROW
-9.5448 11.5746

Station  at Station number 520.0000 and elevation 378.6202 and access distance 0.0000 and center 522.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669271.0206 100364.7376 378.6202
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.6699,-9.6699]
-9.6699 with fill 0.0000 and cut 100.6534
No fill -9999.0000
Maximum volume cut is 503.6821
Material name: SR
Interval for the levels is : [-9.6699,-9.6699]
-9.6699 with fill 0.0000 and cut 219.0439
No fill -9999.0000
Maximum volume cut is 1087.3940
Template id: HROW
-9.6699 23.1036
Template id: MCUT
-9.6699 9.6699
Template id: MFILL
-9.6699 -9.6699
Template id: VROW
-9.6699 11.7078

Station  at Station number 525.0000 and elevation 378.5169 and access distance 0.0000 and center 527.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669274.4040 100361.0562 378.5169
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.5262,-9.5262]
-9.5262 with fill 0.0000 and cut 100.8194
No fill -9999.0000
Maximum volume cut is 500.0213
Material name: SR
Interval for the levels is : [-9.5262,-9.5262]
-9.5262 with fill 0.0000 and cut 215.9137
No fill -9999.0000
Maximum volume cut is 1044.6235
Template id: HROW
-9.5262 23.4080
Template id: MCUT
-9.5262 9.5262
Template id: MFILL
-9.5262 -9.5262
Template id: VROW
-9.5262 11.8633

Station  at Station number 530.0000 and elevation 378.2044 and access distance 0.0000 and center 530.8347
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669277.7874 100357.3749 378.2044
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.1817,-9.1817]
-9.1817 with fill 0.0000 and cut 99.1891
No fill -9999.0000
Maximum volume cut is 165.0262
Material name: SR
Interval for the levels is : [-9.1817,-9.1817]
-9.1817 with fill 0.0000 and cut 201.9357
No fill -9999.0000
Maximum volume cut is 333.3033
Template id: HROW
-9.1817 23.2799
Template id: MCUT
-9.1817 9.1817
Template id: MFILL
-9.1817 -9.1817
Template id: VROW
-9.1817 11.7353

Station  at Station number 531.6694 and elevation 378.0883 and access distance 0.0000 and center 533.3347
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669278.9171 100356.1457 378.0883
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-9.0567,-9.0567]
-9.0567 with fill 0.0000 and cut 98.5186
No fill -9999.0000
Maximum volume cut is 326.1026
Material name: SR
Interval for the levels is : [-9.0567,-9.0567]
-9.0567 with fill 0.0000 and cut 197.3744
No fill -9999.0000
Maximum volume cut is 643.1601
Template id: HROW
-9.0567 23.1711
Template id: MCUT
-9.0567 9.0567
Template id: MFILL
-9.0567 -9.0567
Template id: VROW
-9.0567 11.6264

Station  at Station number 535.0000 and elevation 377.8565 and access distance 0.0000 and center 535.2476
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669281.1708 100353.6935 377.8565
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-8.8100,-8.8100]
-8.8100 with fill 0.0000 and cut 97.3033
No fill -9999.0000
Maximum volume cut is 48.1379
Material name: SR
Interval for the levels is : [-8.8100,-8.8100]
-8.8100 with fill 0.0000 and cut 188.8379
No fill -9999.0000
Maximum volume cut is 93.1972
Template id: HROW
-8.8100 22.9222
Template id: MCUT
-8.8100 8.8100
Template id: MFILL
-8.8100 -8.8100
Template id: VROW
-8.8100 11.3776

Station  at Station number 535.4952 and elevation 377.8220 and access distance 0.0000 and center 537.7476
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669281.5059 100353.3289 377.8220
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-8.7736,-8.7736]
-8.7736 with fill 0.0000 and cut 97.1244
No fill -9999.0000
Maximum volume cut is 432.1542
Material name: SR
Interval for the levels is : [-8.7736,-8.7736]
-8.7736 with fill 0.0000 and cut 187.5832
No fill -9999.0000
Maximum volume cut is 816.5227
Template id: HROW
-8.7736 22.8856
Template id: MCUT
-8.7736 8.7736
Template id: MFILL
-8.7736 -8.7736
Template id: VROW
-8.7736 11.3409

Station  at Station number 540.0000 and elevation 377.5085 and access distance 0.0000 and center 542.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669284.5543 100350.0121 377.5085
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-8.4466,-8.4466]
-8.4466 with fill 0.0000 and cut 94.7384
No fill -9999.0000
Maximum volume cut is 465.8341
Material name: SR
Interval for the levels is : [-8.4466,-8.4466]
-8.4466 with fill 0.0000 and cut 174.9271
No fill -9999.0000
Maximum volume cut is 829.4753
Template id: HROW
-8.4466 22.5567
Template id: MCUT
-8.4466 8.4466
Template id: MFILL
-8.4466 -8.4466
Template id: VROW
-8.4466 11.0121

Station  at Station number 545.0000 and elevation 376.9666 and access distance 0.0000 and center 547.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669287.9377 100346.3308 376.9666
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-7.8977,-7.8977]
-7.8977 with fill 0.0000 and cut 91.5953
No fill -9999.0000
Maximum volume cut is 449.1847
Material name: SR
Interval for the levels is : [-7.8977,-7.8977]
-7.8977 with fill 0.0000 and cut 156.8630
No fill -9999.0000
Maximum volume cut is 723.9089
Template id: HROW
-7.8977 21.9865
Template id: MCUT
-7.8977 7.8977
Template id: MFILL
-7.8977 -7.8977
Template id: VROW
-7.8977 10.4418

Station  at Station number 550.0000 and elevation 376.1185 and access distance 0.0000 and center 551.8385
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669291.3211 100342.6494 376.1185
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-7.0508,-7.0508]
-7.0508 with fill 0.0000 and cut 88.0786
No fill -9999.0000
Maximum volume cut is 318.3716
Material name: SR
Interval for the levels is : [-7.0508,-7.0508]
-7.0508 with fill 0.0000 and cut 132.7005
No fill -9999.0000
Maximum volume cut is 452.3698
Template id: HROW
-7.0508 21.3733
Template id: MCUT
-7.0508 7.0508
Template id: MFILL
-7.0508 -7.0508
Template id: VROW
-7.0508 9.8287

Station  at Station number 553.6770 and elevation 375.4759 and access distance 0.0000 and center 554.3385
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669293.8093 100339.9422 375.4759
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-6.4143,-6.4143]
-6.4143 with fill 0.0000 and cut 85.0909
No fill -9999.0000
Maximum volume cut is 111.7739
Material name: SR
Interval for the levels is : [-6.4143,-6.4143]
-6.4143 with fill 0.0000 and cut 113.3537
No fill -9999.0000
Maximum volume cut is 145.5751
Template id: HROW
-6.4143 20.8824
Template id: MCUT
-6.4143 6.4143
Template id: MFILL
-6.4143 -6.4143
Template id: VROW
-6.4143 9.3378

Station  at Station number 555.0000 and elevation 375.2432 and access distance 0.0000 and center 557.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669294.7045 100338.9681 375.2432
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-6.1851,-6.1851]
-6.1851 with fill 0.0000 and cut 83.8785
No fill -9999.0000
Maximum volume cut is 408.0343
Material name: SR
Interval for the levels is : [-6.1851,-6.1851]
-6.1851 with fill 0.0000 and cut 106.7135
No fill -9999.0000
Maximum volume cut is 472.1304
Template id: HROW
-6.1851 20.6359
Template id: MCUT
-6.1851 6.1851
Template id: MFILL
-6.1851 -6.1851
Template id: VROW
-6.1851 9.0700

Station  at Station number 560.0000 and elevation 374.3621 and access distance 0.0000 and center 561.0876
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669298.0880 100335.2867 374.3621
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-5.3219,-5.3219]
-5.3219 with fill 0.0000 and cut 79.3352
No fill -9999.0000
Maximum volume cut is 170.4370
Material name: SR
Interval for the levels is : [-5.3219,-5.3219]
-5.3219 with fill 0.0000 and cut 82.1387
No fill -9999.0000
Maximum volume cut is 167.3893
Template id: HROW
-5.3219 19.7120
Template id: MCUT
-5.3219 5.3219
Template id: MFILL
-5.3219 -5.3219
Template id: VROW
-5.3219 8.0642

Station  at Station number 562.1752 and elevation 373.9788 and access distance 0.0000 and center 563.5876
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669299.5599 100333.6852 373.9788
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-4.9490,-4.9490]
-4.9490 with fill 0.0000 and cut 77.3759
No fill -9999.0000
Maximum volume cut is 215.0458
Material name: SR
Interval for the levels is : [-4.9490,-4.9490]
-4.9490 with fill 0.0000 and cut 71.7701
No fill -9999.0000
Maximum volume cut is 184.4055
Template id: HROW
-4.9490 19.3138
Template id: MCUT
-4.9490 4.9490
Template id: MFILL
-4.9490 -4.9490
Template id: VROW
-4.9490 7.6299

Station  at Station number 565.0000 and elevation 373.4458 and access distance 0.0000 and center 567.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669301.4616 100331.5964 373.4458
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-4.4318,-4.4318]
-4.4318 with fill 0.0000 and cut 74.8784
No fill -9999.0000
Maximum volume cut is 361.0434
Material name: SR
Interval for the levels is : [-4.4318,-4.4318]
-4.4318 with fill 0.0000 and cut 58.7905
No fill -9999.0000
Maximum volume cut is 241.3599
Template id: HROW
-4.4318 18.8395
Template id: MCUT
-4.4318 4.4318
Template id: MFILL
-4.4318 -4.4318
Template id: VROW
-4.4318 7.1082

Station  at Station number 570.0000 and elevation 372.5126 and access distance 0.0000 and center 572.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669304.7791 100327.8556 372.5126
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-3.5332,-3.5332]
-3.5332 with fill 0.0000 and cut 69.5390
No fill -9999.0000
Maximum volume cut is 322.5223
Material name: SR
Interval for the levels is : [-3.5332,-3.5332]
-3.5332 with fill 0.0000 and cut 37.7534
No fill -9999.0000
Maximum volume cut is 150.8479
Template id: HROW
-3.5332 17.9779
Template id: MCUT
-3.5332 3.5332
Template id: MFILL
-3.5332 -3.5332
Template id: VROW
-3.5332 6.1610

Station  at Station number 575.0000 and elevation 371.5938 and access distance 0.0000 and center 575.2476
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669308.0338 100324.0600 371.5938
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-2.6573,-2.6573]
-2.6573 with fill 0.0000 and cut 59.4700
No fill -9999.0000
Maximum volume cut is 29.1597
Material name: SR
Interval for the levels is : [-2.6573,-2.6573]
-2.6573 with fill 0.0000 and cut 22.5857
No fill -9999.0000
Maximum volume cut is 10.8729
Template id: HROW
-2.6573 17.1202
Template id: MCUT
-2.6573 2.6573
Template id: MFILL
-2.6573 -2.6573
Template id: VROW
-2.6573 5.2155

Station  at Station number 575.4952 and elevation 371.5036 and access distance 0.0000 and center 577.7476
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669308.3527 100323.6812 371.5036
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-2.5718,-2.5718]
-2.5718 with fill 0.0000 and cut 58.3052
No fill -9999.0000
Maximum volume cut is 238.2599
Material name: SR
Interval for the levels is : [-2.5718,-2.5718]
-2.5718 with fill 0.0000 and cut 21.3298
No fill -9999.0000
Maximum volume cut is 73.7047
Template id: HROW
-2.5718 17.0337
Template id: MCUT
-2.5718 2.5718
Template id: MFILL
-2.5718 -2.5718
Template id: VROW
-2.5718 5.1202

Station  at Station number 580.0000 and elevation 370.6446 and access distance 0.0000 and center 582.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669311.2248 100320.2107 370.6446
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-1.7593,-1.7593]
-1.7593 with fill 0.0000 and cut 47.4747
No fill -9999.0000
Maximum volume cut is 205.2844
Material name: SR
Interval for the levels is : [-1.7593,-1.7593]
-1.7593 with fill 0.0000 and cut 11.3928
No fill -9999.0000
Maximum volume cut is 39.3516
Material name: q3
Interval for the levels is : [-1.7593,-1.7593]
-1.7593 with fill 0.0000 and cut 0.0000
Maximum volume fill is 2.4738
No cut -9999.0000
Template id: HROW
-1.7593 16.1584
Template id: MCUT
-1.7593 1.7593
Template id: MFILL
-1.7593 -1.7593
Template id: VROW
-1.7593 4.2449

Station  at Station number 585.0000 and elevation 369.7030 and access distance 0.0000 and center 587.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669314.3512 100316.3088 369.7030
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.8773,-0.8773]
-0.8773 with fill 0.0000 and cut 34.6391
No fill -9999.0000
Maximum volume cut is 144.6641
Material name: SR
Interval for the levels is : [-0.8773,-0.8773]
-0.8773 with fill 0.0000 and cut 4.3479
No fill -9999.0000
Maximum volume cut is 13.4695
Material name: q3
Interval for the levels is : [-0.8773,-0.8773]
-0.8773 with fill 0.9895 and cut 0.0000
Maximum volume fill is 20.1631
No cut -9999.0000
Template id: HROW
-0.8773 15.2075
Template id: MCUT
-0.8773 0.8773
Template id: MFILL
-0.8773 -0.8773
Template id: VROW
-0.8773 3.2940

Station  at Station number 590.0000 and elevation 368.7773 and access distance 0.0000 and center 591.3791
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669317.4121 100312.3553 368.7773
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0196,-0.0196]
-0.0196 with fill 0.0000 and cut 23.2266
No fill -9999.0000
Maximum volume cut is 57.4029
Material name: SR
Interval for the levels is : [-0.0196,-0.0196]
-0.0196 with fill 0.0000 and cut 1.0399
No fill -9999.0000
Maximum volume cut is 1.7308
Material name: q3
Interval for the levels is : [-0.0196,-0.0196]
-0.0196 with fill 7.0757 and cut 0.0000
Maximum volume fill is 25.7896
No cut -9999.0000
Template id: HROW
-0.0196 14.3117
Template id: MCUT
-0.0196 0.0196
Template id: MFILL
-0.0196 -0.0196
Template id: VROW
-0.0196 2.7515

Station  at Station number 592.7582 and elevation 368.3538 and access distance 0.0000 and center 593.8791
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669319.0723 100310.1528 368.3538
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [0.3629,0.3629]
0.3629 with fill 0.0000 and cut 18.3974
No fill -9999.0000
Maximum volume cut is 36.9738
Material name: SR
Interval for the levels is : [0.3629,0.3629]
0.3629 with fill 0.0000 and cut 0.2151
No fill -9999.0000
Maximum volume cut is 0.2411
Material name: q3
Interval for the levels is : [0.3629,0.3629]
0.3629 with fill 11.6248 and cut 0.0000
Maximum volume fill is 30.1571
No cut -9999.0000
Template id: HROW
0.3629 13.8315
Template id: MCUT
0.3629 -0.3629
Template id: MFILL
0.3629 0.3629
Template id: VROW
0.3629 3.1221

Station  at Station number 595.0000 and elevation 368.0179 and access distance 0.0000 and center 595.9191
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669320.4068 100308.3514 368.0179
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6644,0.6644]
0.6644 with fill 0.0000 and cut 14.5879
No fill -9999.0000
Maximum volume cut is 24.0999
Material name: q3
Interval for the levels is : [0.6644,0.6644]
0.6644 with fill 15.2792 and cut 0.0000
Maximum volume fill is 30.9853
No cut -9999.0000
Template id: HROW
0.6644 13.4433
Template id: MCUT
0.6644 -0.6644
Template id: MFILL
0.6644 0.6644
Template id: VROW
0.6644 3.3858

Station  at Station number 596.8382 and elevation 367.7450 and access distance 0.0000 and center 598.4191
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669321.4909 100306.8669 367.7450
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.9092,0.9092]
0.9092 with fill 0.0000 and cut 11.6332
No fill -9999.0000
Maximum volume cut is 29.9304
Material name: q3
Interval for the levels is : [0.9092,0.9092]
0.9092 with fill 18.4334 and cut 0.0000
Maximum volume fill is 67.5220
No cut -9999.0000
Template id: HROW
0.9092 13.6121
Template id: MCUT
0.9092 -0.9092
Template id: MFILL
0.9092 0.9092
Template id: VROW
0.9092 3.5965

Station  at Station number 600.0000 and elevation 367.2810 and access distance 0.0000 and center 602.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669323.3343 100304.2981 367.2810
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.3264,1.3264]
1.3264 with fill 0.0000 and cut 7.2993
No fill -9999.0000
Maximum volume cut is 25.4795
Material name: q3
Interval for the levels is : [1.3264,1.3264]
1.3264 with fill 24.2777 and cut 0.0000
Maximum volume fill is 147.5344
No cut -9999.0000
Template id: HROW
1.3264 14.3332
Template id: MCUT
1.3264 -1.3264
Template id: MFILL
1.3264 1.3264
Template id: VROW
1.3264 3.9571

Station  at Station number 605.0000 and elevation 366.5439 and access distance 0.0000 and center 607.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669326.1938 100300.1965 366.5439
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.9962,1.9962]
1.9962 with fill 0.0000 and cut 2.8926
No fill -9999.0000
Maximum volume cut is 9.3887
Material name: q3
Interval for the levels is : [1.9962,1.9962]
1.9962 with fill 34.7360 and cut 0.0000
Maximum volume fill is 201.3287
No cut -9999.0000
Template id: HROW
1.9962 15.4702
Template id: MCUT
1.9962 -1.9962
Template id: MFILL
1.9962 1.9962
Template id: VROW
1.9962 4.5256

Station  at Station number 610.0000 and elevation 366.0353 and access distance 0.0000 and center 612.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669328.9846 100296.0479 366.0353
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [2.4459,2.4459]
2.4459 with fill 0.0000 and cut 0.8629
No fill -9999.0000
Maximum volume cut is 2.1573
Material name: q3
Interval for the levels is : [2.4459,2.4459]
2.4459 with fill 45.7955 and cut 0.0000
Maximum volume fill is 252.7843
No cut -9999.0000
Template id: HROW
2.4459 16.4746
Template id: MCUT
2.4459 -2.4459
Template id: MFILL
2.4459 2.4459
Template id: VROW
2.4459 5.0278

Station  at Station number 615.0000 and elevation 365.5855 and access distance 0.0000 and center 617.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669331.7058 100291.8534 365.5855
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [2.8451,2.8451]
2.8451 with fill 55.3182 and cut 0.0000
Maximum volume fill is 291.0688
No cut -9999.0000
Template id: HROW
2.8451 16.4080
Template id: MCUT
2.8451 -2.8451
Template id: MFILL
2.8451 2.8451
Template id: VROW
2.8451 4.9945

Station  at Station number 620.0000 and elevation 365.2937 and access distance 0.0000 and center 622.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669334.3568 100287.6141 365.2937
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.0946,3.0946]
3.0946 with fill 61.1093 and cut 0.0000
Maximum volume fill is 316.9751
No cut -9999.0000
Template id: HROW
3.0946 16.3461
Template id: MCUT
3.0946 -3.0946
Template id: MFILL
3.0946 3.0946
Template id: VROW
3.0946 4.9635

Station  at Station number 625.0000 and elevation 364.9865 and access distance 0.0000 and center 627.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669336.9367 100283.3312 364.9865
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.3680,3.3680]
3.3680 with fill 65.6808 and cut 0.0000
Maximum volume fill is 338.4165
No cut -9999.0000
Template id: HROW
3.3680 16.2686
Template id: MCUT
3.3680 -3.3680
Template id: MFILL
3.3680 3.3680
Template id: VROW
3.3680 4.9248

Station  at Station number 630.0000 and elevation 364.7166 and access distance 0.0000 and center 632.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669339.4449 100279.0058 364.7166
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.6123,3.6123]
3.6123 with fill 69.6858 and cut 0.0000
Maximum volume fill is 357.5846
No cut -9999.0000
Template id: HROW
3.6123 16.2016
Template id: MCUT
3.6123 -3.6123
Template id: MFILL
3.6123 3.6123
Template id: VROW
3.6123 4.8913

Station  at Station number 635.0000 and elevation 364.4755 and access distance 0.0000 and center 637.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669341.8807 100274.6393 364.4755
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.8362,3.8362]
3.8362 with fill 73.3480 and cut 0.0000
Maximum volume fill is 372.1351
No cut -9999.0000
Template id: HROW
3.8362 16.2555
Template id: MCUT
3.8362 -3.8362
Template id: MFILL
3.8362 3.8362
Template id: VROW
3.8362 4.9182

Station  at Station number 640.0000 and elevation 364.2510 and access distance 0.0000 and center 642.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669344.2433 100270.2328 364.2510
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.0517,4.0517]
4.0517 with fill 75.5061 and cut 0.0000
Maximum volume fill is 378.0738
No cut -9999.0000
Template id: HROW
4.0517 15.2099
Template id: MCUT
4.0517 -4.0517
Template id: MFILL
4.0517 4.0517
Template id: VROW
4.0517 4.3954

Station  at Station number 645.0000 and elevation 364.2588 and access distance 0.0000 and center 647.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669346.5322 100265.7876 364.2588
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.0433,4.0433]
4.0433 with fill 75.7235 and cut 0.0000
Maximum volume fill is 375.8103
No cut -9999.0000
Template id: HROW
4.0433 14.0946
Template id: MCUT
4.0433 -4.0433
Template id: MFILL
4.0433 4.0433
Template id: VROW
4.0433 3.8378

Station  at Station number 650.0000 and elevation 364.2776 and access distance 0.0000 and center 652.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669348.7467 100261.3048 364.2776
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.0323,4.0323]
4.0323 with fill 74.6007 and cut 0.0000
Maximum volume fill is 367.1238
No cut -9999.0000
Template id: HROW
4.0323 13.1084
Template id: MCUT
4.0323 -4.0323
Template id: MFILL
4.0323 4.0323
Template id: VROW
4.0323 3.3446

Station  at Station number 655.0000 and elevation 364.2373 and access distance 0.0000 and center 657.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669350.8862 100256.7857 364.2373
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.0887,4.0887]
4.0887 with fill 72.2489 and cut 0.0000
Maximum volume fill is 348.6975
No cut -9999.0000
Template id: HROW
4.0887 12.6032
Template id: MCUT
4.0887 -4.0887
Template id: MFILL
4.0887 4.0887
Template id: VROW
4.0887 3.4859

Station  at Station number 660.0000 and elevation 364.2458 and access distance 0.0000 and center 662.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669352.9501 100252.2316 364.2458
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.1046,4.1046]
4.1046 with fill 67.2301 and cut 0.0000
Maximum volume fill is 321.0521
No cut -9999.0000
Template id: HROW
4.1046 13.0036
Template id: MCUT
4.1046 -4.1046
Template id: MFILL
4.1046 4.1046
Template id: VROW
4.1046 3.6861

Station  at Station number 665.0000 and elevation 364.2221 and access distance 0.0000 and center 667.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669354.9377 100247.6437 364.2221
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.1611,4.1611]
4.1611 with fill 61.1907 and cut 0.0000
Maximum volume fill is 290.8260
No cut -9999.0000
Template id: HROW
4.1611 13.3996
Template id: MCUT
4.1611 -4.1611
Template id: MFILL
4.1611 4.1611
Template id: VROW
4.1611 3.8842

Station  at Station number 670.0000 and elevation 364.2005 and access distance 0.0000 and center 672.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669356.8487 100243.0233 364.2005
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [4.2238,4.2238]
4.2238 with fill 55.1397 and cut 0.0000
Maximum volume fill is 260.2383
No cut -9999.0000
Template id: HROW
4.2238 13.5386
Template id: MCUT
4.2238 -4.2238
Template id: MFILL
4.2238 4.2238
Template id: VROW
4.2238 3.9536

Station  at Station number 675.0000 and elevation 365.1712 and access distance 0.0000 and center 677.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669358.6824 100238.3718 365.1712
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 
Material name: q3
Interval for the levels is : [3.3025,3.3025]
3.3025 with fill 48.9557 and cut 0.0000
Maximum volume fill is 227.8804
No cut -9999.0000
Template id: HROW
3.3025 13.5446
Template id: MCUT
3.3025 -3.3025
Template id: MFILL
3.3025 3.3025
Template id: VROW
3.3025 3.9567

Station  at Station number 680.0000 and elevation 366.0993 and access distance 0.0000 and center 682.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669360.4383 100233.6903 366.0993
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: q3 GR 
Material name: GR
Interval for the levels is : [2.4322,2.4322]
2.4322 with fill 0.0000 and cut 0.0000
No fill -9999.0000
Maximum volume cut is 0.1844
Material name: q3
Interval for the levels is : [2.4322,2.4322]
2.4322 with fill 42.1965 and cut 0.0000
Maximum volume fill is 194.9365
No cut -9999.0000
Template id: HROW
2.4322 13.5567
Template id: MCUT
2.4322 -2.4322
Template id: MFILL
2.4322 2.4322
Template id: VROW
2.4322 3.9627

Station  at Station number 685.0000 and elevation 367.1035 and access distance 0.0000 and center 687.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669362.1159 100228.9802 367.1035
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [1.4941,1.4941]
1.4941 with fill 0.0000 and cut 0.0738
No fill -9999.0000
Maximum volume cut is 0.5854
Material name: q3
Interval for the levels is : [1.4941,1.4941]
1.4941 with fill 35.7781 and cut 0.0000
Maximum volume fill is 165.2313
No cut -9999.0000
Template id: HROW
1.4941 13.5748
Template id: MCUT
1.4941 -1.4941
Template id: MFILL
1.4941 1.4941
Template id: VROW
1.4941 3.9717

Station  at Station number 690.0000 and elevation 367.7979 and access distance 0.0000 and center 692.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669363.7148 100224.2428 367.7979
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.8741,0.8741]
0.8741 with fill 0.0000 and cut 0.1604
No fill -9999.0000
Maximum volume cut is 0.9586
Material name: q3
Interval for the levels is : [0.8741,0.8741]
0.8741 with fill 30.3144 and cut 0.0000
Maximum volume fill is 142.7479
No cut -9999.0000
Template id: HROW
0.8741 13.7009
Template id: MCUT
0.8741 -0.8741
Template id: MFILL
0.8741 0.8741
Template id: VROW
0.8741 4.0348

Station  at Station number 695.0000 and elevation 368.0190 and access distance 0.0000 and center 697.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669365.2345 100219.4794 368.0190
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.7357,0.7357]
0.7357 with fill 0.0000 and cut 0.2231
No fill -9999.0000
Maximum volume cut is 1.2233
Material name: q3
Interval for the levels is : [0.7357,0.7357]
0.7357 with fill 26.7847 and cut 0.0000
Maximum volume fill is 125.1770
No cut -9999.0000
Template id: HROW
0.7357 13.8486
Template id: MCUT
0.7357 -0.7357
Template id: MFILL
0.7357 0.7357
Template id: VROW
0.7357 4.1086

Station  at Station number 700.0000 and elevation 368.2378 and access distance 0.0000 and center 702.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669366.6746 100214.6914 368.2378
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.6080,0.6080]
0.6080 with fill 0.0000 and cut 0.2662
No fill -9999.0000
Maximum volume cut is 1.4164
Material name: q3
Interval for the levels is : [0.6080,0.6080]
0.6080 with fill 23.2861 and cut 0.0000
Maximum volume fill is 108.0323
No cut -9999.0000
Template id: HROW
0.6080 13.9316
Template id: MCUT
0.6080 -0.6080
Template id: MFILL
0.6080 0.6080
Template id: VROW
0.6080 4.1502

Station  at Station number 705.0000 and elevation 368.4756 and access distance 0.0000 and center 707.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669368.0348 100209.8800 368.4756
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.4697,0.4697]
0.4697 with fill 0.0000 and cut 0.3003
No fill -9999.0000
Maximum volume cut is 1.4481
Material name: q3
Interval for the levels is : [0.4697,0.4697]
0.4697 with fill 19.9269 and cut 0.0000
Maximum volume fill is 90.7253
No cut -9999.0000
Template id: HROW
0.4697 14.0122
Template id: MCUT
0.4697 -0.4697
Template id: MFILL
0.4697 0.4697
Template id: VROW
0.4697 4.1904

Station  at Station number 710.0000 and elevation 368.6942 and access distance 0.0000 and center 712.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669369.3145 100205.0466 368.6942
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.3588,0.3588]
0.3588 with fill 0.0000 and cut 0.2789
No fill -9999.0000
Maximum volume cut is 1.3137
Material name: q3
Interval for the levels is : [0.3588,0.3588]
0.3588 with fill 16.3633 and cut 0.0000
Maximum volume fill is 74.7461
No cut -9999.0000
Template id: HROW
0.3588 14.0490
Template id: MCUT
0.3588 -0.3588
Template id: MFILL
0.3588 0.3588
Template id: VROW
0.3588 4.2088

Station  at Station number 715.0000 and elevation 368.8798 and access distance 0.0000 and center 716.3046
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669370.5136 100200.1926 368.8798
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2893,0.2893]
0.2893 with fill 0.0000 and cut 0.2466
No fill -9999.0000
Maximum volume cut is 0.7127
Material name: q3
Interval for the levels is : [0.2893,0.2893]
0.2893 with fill 13.5352 and cut 0.0000
Maximum volume fill is 33.6869
No cut -9999.0000
Template id: HROW
0.2893 14.0936
Template id: MCUT
0.2893 -0.2893
Template id: MFILL
0.2893 0.2893
Template id: VROW
0.2893 4.2311

Station  at Station number 717.6093 and elevation 368.9671 and access distance 0.0000 and center 718.8046
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669371.1071 100197.6517 368.9671
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2659,0.2659]
0.2659 with fill 0.0000 and cut 0.2998
No fill -9999.0000
Maximum volume cut is 0.8610
Material name: q3
Interval for the levels is : [0.2659,0.2659]
0.2659 with fill 12.2859 and cut 0.0000
Maximum volume fill is 28.2704
No cut -9999.0000
Template id: HROW
0.2659 14.0917
Template id: MCUT
0.2659 -0.2659
Template id: MFILL
0.2659 0.2659
Template id: VROW
0.2659 4.2302

Station  at Station number 720.0000 and elevation 369.0459 and access distance 0.0000 and center 722.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669371.6315 100195.3192 369.0459
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2467,0.2467]
0.2467 with fill 0.0000 and cut 0.4205
No fill -9999.0000
Maximum volume cut is 7.3891
Material name: q3
Interval for the levels is : [0.2467,0.2467]
0.2467 with fill 11.3640 and cut 0.0000
Maximum volume fill is 54.3654
No cut -9999.0000
Template id: HROW
0.2467 14.1079
Template id: MCUT
0.2467 -0.2467
Template id: MFILL
0.2467 0.2467
Template id: VROW
0.2467 4.2383

Station  at Station number 725.0000 and elevation 369.1966 and access distance 0.0000 and center 727.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669372.6681 100190.4279 369.1966
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.2206,0.2206]
0.2206 with fill 0.0000 and cut 2.5351
No fill -9999.0000
Maximum volume cut is 12.7735
Material name: q3
Interval for the levels is : [0.2206,0.2206]
0.2206 with fill 10.3821 and cut 0.0000
Maximum volume fill is 48.7309
No cut -9999.0000
Template id: HROW
0.2206 14.1987
Template id: MCUT
0.2206 -0.2206
Template id: MFILL
0.2206 0.2206
Template id: VROW
0.2206 4.2837

Station  at Station number 730.0000 and elevation 369.3911 and access distance 0.0000 and center 732.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669373.6230 100185.5200 369.3911
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.1507,0.1507]
0.1507 with fill 0.0000 and cut 2.5743
No fill -9999.0000
Maximum volume cut is 14.0880
Material name: q3
Interval for the levels is : [0.1507,0.1507]
0.1507 with fill 9.1102 and cut 0.0000
Maximum volume fill is 44.7687
No cut -9999.0000
Template id: HROW
0.1507 14.2567
Template id: MCUT
0.1507 -0.1507
Template id: MFILL
0.1507 0.1507
Template id: VROW
0.1507 4.3127

Station  at Station number 735.0000 and elevation 369.5655 and access distance 0.0000 and center 737.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669374.4960 100180.5968 369.5655
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.1009,0.1009]
0.1009 with fill 0.0000 and cut 3.0609
No fill -9999.0000
Maximum volume cut is 15.7389
Material name: q3
Interval for the levels is : [0.1009,0.1009]
0.1009 with fill 8.7973 and cut 0.0000
Maximum volume fill is 44.3996
No cut -9999.0000
Template id: HROW
0.1009 14.3073
Template id: MCUT
0.1009 -0.1009
Template id: MFILL
0.1009 0.1009
Template id: VROW
0.1009 4.3380

Station  at Station number 740.0000 and elevation 369.7326 and access distance 0.0000 and center 742.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669375.2869 100175.6598 369.7326
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.0584,0.0584]
0.0584 with fill 0.0000 and cut 3.2346
No fill -9999.0000
Maximum volume cut is 15.6357
Material name: q3
Interval for the levels is : [0.0584,0.0584]
0.0584 with fill 8.9626 and cut 0.0000
Maximum volume fill is 43.9484
No cut -9999.0000
Template id: HROW
0.0584 14.2138
Template id: MCUT
0.0584 -0.0584
Template id: MFILL
0.0584 0.0584
Template id: VROW
0.0584 4.2912

Station  at Station number 745.0000 and elevation 369.8952 and access distance 0.0000 and center 747.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669375.9953 100170.7103 369.8952
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [0.0204,0.0204]
0.0204 with fill 0.0000 and cut 3.0196
No fill -9999.0000
Maximum volume cut is 15.7335
Material name: q3
Interval for the levels is : [0.0204,0.0204]
0.0204 with fill 8.6168 and cut 0.0000
Maximum volume fill is 42.1392
No cut -9999.0000
Template id: HROW
0.0204 14.1479
Template id: MCUT
0.0204 -0.0204
Template id: MFILL
0.0204 0.0204
Template id: VROW
0.0204 4.2583

Station  at Station number 750.0000 and elevation 370.0574 and access distance 0.0000 and center 751.6527
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669376.6212 100165.7497 370.0574
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0172,-0.0172]
-0.0172 with fill 0.0000 and cut 3.2738
No fill -9999.0000
Maximum volume cut is 11.1518
Material name: q3
Interval for the levels is : [-0.0172,-0.0172]
-0.0172 with fill 8.2389 and cut 0.0000
Maximum volume fill is 26.7847
No cut -9999.0000
Template id: HROW
-0.0172 14.0732
Template id: MCUT
-0.0172 0.0172
Template id: MFILL
-0.0172 -0.0172
Template id: VROW
-0.0172 4.2209

Station  at Station number 753.3053 and elevation 370.1617 and access distance 0.0000 and center 754.1527
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669376.9895 100162.4650 370.1617
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0391,-0.0391]
-0.0391 with fill 0.0000 and cut 3.4739
No fill -9999.0000
Maximum volume cut is 5.9342
Material name: q3
Interval for the levels is : [-0.0391,-0.0391]
-0.0391 with fill 7.9680 and cut 0.0000
Maximum volume fill is 13.5365
No cut -9999.0000
Template id: HROW
-0.0391 13.9850
Template id: MCUT
-0.0391 0.0391
Template id: MFILL
-0.0391 -0.0391
Template id: VROW
-0.0391 4.1768

Station  at Station number 755.0000 and elevation 370.2113 and access distance 0.0000 and center 757.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669377.1642 100160.7794 370.2113
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0465,-0.0465]
-0.0465 with fill 0.0000 and cut 3.5295
No fill -9999.0000
Maximum volume cut is 17.7854
Material name: q3
Interval for the levels is : [-0.0465,-0.0465]
-0.0465 with fill 8.0076 and cut 0.0000
Maximum volume fill is 40.8552
No cut -9999.0000
Template id: HROW
-0.0465 13.9280
Template id: MCUT
-0.0465 0.0465
Template id: MFILL
-0.0465 -0.0465
Template id: VROW
-0.0465 4.1406

Station  at Station number 760.0000 and elevation 370.3349 and access distance 0.0000 and center 762.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669377.6244 100155.8006 370.3349
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0455,-0.0455]
-0.0455 with fill 0.0000 and cut 3.5847
No fill -9999.0000
Maximum volume cut is 17.9428
Material name: q3
Interval for the levels is : [-0.0455,-0.0455]
-0.0455 with fill 8.3345 and cut 0.0000
Maximum volume fill is 42.6545
No cut -9999.0000
Template id: HROW
-0.0455 13.8877
Template id: MCUT
-0.0455 0.0455
Template id: MFILL
-0.0455 -0.0455
Template id: VROW
-0.0455 4.0973

Station  at Station number 765.0000 and elevation 370.4602 and access distance 0.0000 and center 765.8127
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.0016 100150.8149 370.4602
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0461,-0.0461]
-0.0461 with fill 0.0000 and cut 3.5924
No fill -9999.0000
Maximum volume cut is 5.8375
Material name: q3
Interval for the levels is : [-0.0461,-0.0461]
-0.0461 with fill 8.7273 and cut 0.0000
Maximum volume fill is 14.2418
No cut -9999.0000
Template id: HROW
-0.0461 13.8361
Template id: MCUT
-0.0461 0.0461
Template id: MFILL
-0.0461 -0.0461
Template id: VROW
-0.0461 4.0481

Station  at Station number 766.6253 and elevation 370.5013 and access distance 0.0000 and center 768.3127
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.1063 100149.1930 370.5013
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0467,-0.0467]
-0.0467 with fill 0.0000 and cut 3.5907
No fill -9999.0000
Maximum volume cut is 12.1193
Material name: q3
Interval for the levels is : [-0.0467,-0.0467]
-0.0467 with fill 8.7973 and cut 0.0000
Maximum volume fill is 29.8228
No cut -9999.0000
Template id: HROW
-0.0467 13.8169
Template id: MCUT
-0.0467 0.0467
Template id: MFILL
-0.0467 -0.0467
Template id: VROW
-0.0467 4.0308

Station  at Station number 770.0000 and elevation 370.5868 and access distance 0.0000 and center 772.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.3145 100145.8248 370.5868
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0481,-0.0481]
-0.0481 with fill 0.0000 and cut 3.5919
No fill -9999.0000
Maximum volume cut is 18.1420
Material name: q3
Interval for the levels is : [-0.0481,-0.0481]
-0.0481 with fill 8.8773 and cut 0.0000
Maximum volume fill is 44.5027
No cut -9999.0000
Template id: HROW
-0.0481 13.7656
Template id: MCUT
-0.0481 0.0481
Template id: MFILL
-0.0481 -0.0481
Template id: VROW
-0.0481 3.9892

Station  at Station number 775.0000 and elevation 370.7240 and access distance 0.0000 and center 775.0618
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.6231 100140.8343 370.7240
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0608,-0.0608]
-0.0608 with fill 0.0000 and cut 3.6649
No fill -9999.0000
Maximum volume cut is 0.4529
Material name: q3
Interval for the levels is : [-0.0608,-0.0608]
-0.0608 with fill 8.9238 and cut 0.0000
Maximum volume fill is 1.1021
No cut -9999.0000
Template id: HROW
-0.0608 13.6392
Template id: MCUT
-0.0608 0.0608
Template id: MFILL
-0.0608 -0.0608
Template id: VROW
-0.0608 3.9022

Station  at Station number 775.1235 and elevation 370.7275 and access distance 0.0000 and center 777.5618
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.6307 100140.7110 370.7275
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0612,-0.0612]
-0.0612 with fill 0.0000 and cut 3.6675
No fill -9999.0000
Maximum volume cut is 18.3673
Material name: q3
Interval for the levels is : [-0.0612,-0.0612]
-0.0612 with fill 8.9202 and cut 0.0000
Maximum volume fill is 41.9237
No cut -9999.0000
Template id: HROW
-0.0612 13.6357
Template id: MCUT
-0.0612 0.0612
Template id: MFILL
-0.0612 -0.0612
Template id: VROW
-0.0612 3.8998

Station  at Station number 780.0000 and elevation 370.8646 and access distance 0.0000 and center 782.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669378.9316 100135.8438 370.8646
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0767,-0.0767]
-0.0767 with fill 0.0000 and cut 3.8655
No fill -9999.0000
Maximum volume cut is 20.1606
Material name: q3
Interval for the levels is : [-0.0767,-0.0767]
-0.0767 with fill 8.2741 and cut 0.0000
Maximum volume fill is 38.0566
No cut -9999.0000
Template id: HROW
-0.0767 13.4549
Template id: MCUT
-0.0767 0.0767
Template id: MFILL
-0.0767 -0.0767
Template id: VROW
-0.0767 3.8094

Station  at Station number 785.0000 and elevation 371.0051 and access distance 0.0000 and center 787.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669379.2402 100130.8533 371.0051
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0926,-0.0926]
-0.0926 with fill 0.0000 and cut 4.1987
No fill -9999.0000
Maximum volume cut is 22.3640
Material name: q3
Interval for the levels is : [-0.0926,-0.0926]
-0.0926 with fill 6.9486 and cut 0.0000
Maximum volume fill is 29.8515
No cut -9999.0000
Template id: HROW
-0.0926 13.2695
Template id: MCUT
-0.0926 0.0926
Template id: MFILL
-0.0926 -0.0926
Template id: VROW
-0.0926 3.7167

Station  at Station number 790.0000 and elevation 371.1456 and access distance 0.0000 and center 791.6527
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669379.5487 100125.8629 371.1456
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1085,-0.1085]
-0.1085 with fill 0.0000 and cut 4.7469
No fill -9999.0000
Maximum volume cut is 16.3582
Material name: q3
Interval for the levels is : [-0.1085,-0.1085]
-0.1085 with fill 4.9920 and cut 0.0000
Maximum volume fill is 15.2368
No cut -9999.0000
Template id: HROW
-0.1085 13.0465
Template id: MCUT
-0.1085 0.1085
Template id: MFILL
-0.1085 -0.1085
Template id: VROW
-0.1085 3.6052

Station  at Station number 793.3053 and elevation 371.2316 and access distance 0.0000 and center 794.1527
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669379.7527 100122.5638 371.2316
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1121,-0.1121]
-0.1121 with fill 0.0000 and cut 5.1511
No fill -9999.0000
Maximum volume cut is 8.8593
Material name: q3
Interval for the levels is : [-0.1121,-0.1121]
-0.1121 with fill 4.2274 and cut 0.0000
Maximum volume fill is 6.9120
No cut -9999.0000
Template id: HROW
-0.1121 12.6762
Template id: MCUT
-0.1121 0.1121
Template id: MFILL
-0.1121 -0.1121
Template id: VROW
-0.1121 3.4200

Station  at Station number 795.0000 and elevation 371.2751 and access distance 0.0000 and center 797.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669379.8573 100120.8724 371.2751
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1134,-0.1134]
-0.1134 with fill 0.0000 and cut 5.3044
No fill -9999.0000
Maximum volume cut is 25.6640
Material name: q3
Interval for the levels is : [-0.1134,-0.1134]
-0.1134 with fill 3.9300 and cut 0.0000
Maximum volume fill is 18.4932
No cut -9999.0000
Template id: HROW
-0.1134 12.4661
Template id: MCUT
-0.1134 0.1134
Template id: MFILL
-0.1134 -0.1134
Template id: VROW
-0.1134 3.3150

Station  at Station number 800.0000 and elevation 371.4035 and access distance 0.0000 and center 802.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669380.1658 100115.8819 371.4035
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1172,-0.1172]
-0.1172 with fill 0.0000 and cut 4.9612
No fill -9999.0000
Maximum volume cut is 25.2751
Material name: q3
Interval for the levels is : [-0.1172,-0.1172]
-0.1172 with fill 3.4673 and cut 0.0000
Maximum volume fill is 16.0921
No cut -9999.0000
Template id: HROW
-0.1172 11.8462
Template id: MCUT
-0.1172 0.1172
Template id: MFILL
-0.1172 -0.1172
Template id: VROW
-0.1172 3.0051

Station  at Station number 805.0000 and elevation 371.5320 and access distance 0.0000 and center 807.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669380.4744 100110.8915 371.5320
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1211,-0.1211]
-0.1211 with fill 0.0000 and cut 5.1489
No fill -9999.0000
Maximum volume cut is 26.1869
Material name: q3
Interval for the levels is : [-0.1211,-0.1211]
-0.1211 with fill 2.9695 and cut 0.0000
Maximum volume fill is 13.4674
No cut -9999.0000
Template id: HROW
-0.1211 11.2263
Template id: MCUT
-0.1211 0.1211
Template id: MFILL
-0.1211 -0.1211
Template id: VROW
-0.1211 2.6951

Station  at Station number 810.0000 and elevation 371.6523 and access distance 0.0000 and center 810.7436
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669380.7830 100105.9010 371.6523
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1168,-0.1168]
-0.1168 with fill 0.0000 and cut 5.3259
No fill -9999.0000
Maximum volume cut is 7.9462
Material name: q3
Interval for the levels is : [-0.1168,-0.1168]
-0.1168 with fill 2.4174 and cut 0.0000
Maximum volume fill is 3.4587
No cut -9999.0000
Template id: HROW
-0.1168 10.5034
Template id: MCUT
-0.1168 0.1168
Template id: MFILL
-0.1168 -0.1168
Template id: VROW
-0.1168 2.2681

Station  at Station number 811.4872 and elevation 371.6848 and access distance 0.0000 and center 813.2436
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669380.8747 100104.4167 371.6848
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1123,-0.1123]
-0.1123 with fill 0.0000 and cut 5.3604
No fill -9999.0000
Maximum volume cut is 18.5569
Material name: q3
Interval for the levels is : [-0.1123,-0.1123]
-0.1123 with fill 2.2340 and cut 0.0000
Maximum volume fill is 7.2229
No cut -9999.0000
Template id: HROW
-0.1123 10.5248
Template id: MCUT
-0.1123 0.1123
Template id: MFILL
-0.1123 -0.1123
Template id: VROW
-0.1123 2.1432

Station  at Station number 815.0000 and elevation 371.7617 and access distance 0.0000 and center 817.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669381.0915 100100.9105 371.7617
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1016,-0.1016]
-0.1016 with fill 0.0000 and cut 5.2048
No fill -9999.0000
Maximum volume cut is 25.0324
Material name: q3
Interval for the levels is : [-0.1016,-0.1016]
-0.1016 with fill 1.8783 and cut 0.0000
Maximum volume fill is 8.8148
No cut -9999.0000
Template id: HROW
-0.1016 10.4541
Template id: MCUT
-0.1016 0.1016
Template id: MFILL
-0.1016 -0.1016
Template id: VROW
-0.1016 1.8481

Station  at Station number 820.0000 and elevation 371.8712 and access distance 0.0000 and center 822.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669381.4001 100095.9200 371.8712
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0864,-0.0864]
-0.0864 with fill 0.0000 and cut 4.8082
No fill -9999.0000
Maximum volume cut is 26.1811
Material name: q3
Interval for the levels is : [-0.0864,-0.0864]
-0.0864 with fill 1.6476 and cut 0.0000
Maximum volume fill is 7.4510
No cut -9999.0000
Template id: HROW
-0.0864 10.2099
Template id: MCUT
-0.0864 0.0864
Template id: MFILL
-0.0864 -0.0864
Template id: VROW
-0.0864 1.4281

Station  at Station number 825.0000 and elevation 371.9858 and access distance 0.0000 and center 827.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669381.7086 100090.9296 371.9858
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0765,-0.0765]
-0.0765 with fill 0.0000 and cut 5.6643
No fill -9999.0000
Maximum volume cut is 31.5929
Material name: q3
Interval for the levels is : [-0.0765,-0.0765]
-0.0765 with fill 1.3328 and cut 0.0000
Maximum volume fill is 6.8714
No cut -9999.0000
Template id: HROW
-0.0765 10.6725
Template id: MCUT
-0.0765 0.0765
Template id: MFILL
-0.0765 -0.0765
Template id: VROW
-0.0765 1.4502

Station  at Station number 830.0000 and elevation 372.1175 and access distance 0.0000 and center 832.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669382.0172 100085.9391 372.1175
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0836,-0.0836]
-0.0836 with fill 0.0000 and cut 6.9729
No fill -9999.0000
Maximum volume cut is 38.7518
Material name: q3
Interval for the levels is : [-0.0836,-0.0836]
-0.0836 with fill 1.4158 and cut 0.0000
Maximum volume fill is 7.2958
No cut -9999.0000
Template id: HROW
-0.0836 11.1231
Template id: MCUT
-0.0836 0.0836
Template id: MFILL
-0.0836 -0.0836
Template id: VROW
-0.0836 1.5477

Station  at Station number 835.0000 and elevation 372.2492 and access distance 0.0000 and center 837.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669382.3257 100080.9486 372.2492
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0907,-0.0907]
-0.0907 with fill 0.0000 and cut 8.5278
No fill -9999.0000
Maximum volume cut is 47.2267
Material name: q3
Interval for the levels is : [-0.0907,-0.0907]
-0.0907 with fill 1.5026 and cut 0.0000
Maximum volume fill is 7.6520
No cut -9999.0000
Template id: HROW
-0.0907 11.4650
Template id: MCUT
-0.0907 0.0907
Template id: MFILL
-0.0907 -0.0907
Template id: VROW
-0.0907 1.6242

Station  at Station number 840.0000 and elevation 372.3759 and access distance 0.0000 and center 842.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669382.6343 100075.9582 372.3759
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.0927,-0.0927]
-0.0927 with fill 0.0000 and cut 10.3629
No fill -9999.0000
Maximum volume cut is 56.2388
Material name: q3
Interval for the levels is : [-0.0927,-0.0927]
-0.0927 with fill 1.5583 and cut 0.0000
Maximum volume fill is 6.3965
No cut -9999.0000
Template id: HROW
-0.0927 11.8069
Template id: MCUT
-0.0927 0.0927
Template id: MFILL
-0.0927 -0.0927
Template id: VROW
-0.0927 1.7007

Station  at Station number 845.0000 and elevation 372.5091 and access distance 0.0000 and center 847.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669382.9428 100070.9677 372.5091
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1013,-0.1013]
-0.1013 with fill 0.0000 and cut 12.1327
No fill -9999.0000
Maximum volume cut is 65.4697
Material name: q3
Interval for the levels is : [-0.1013,-0.1013]
-0.1013 with fill 1.0004 and cut 0.0000
Maximum volume fill is 3.4674
No cut -9999.0000
Template id: HROW
-0.1013 12.1185
Template id: MCUT
-0.1013 0.1013
Template id: MFILL
-0.1013 -0.1013
Template id: VROW
-0.1013 1.7493

Station  at Station number 850.0000 and elevation 372.6423 and access distance 0.0000 and center 852.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669383.2514 100065.9772 372.6423
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 
Material name: GR
Interval for the levels is : [-0.1099,-0.1099]
-0.1099 with fill 0.0000 and cut 14.0552
No fill -9999.0000
Maximum volume cut is 76.5050
Material name: q3
Interval for the levels is : [-0.1099,-0.1099]
-0.1099 with fill 0.3866 and cut 0.0000
Maximum volume fill is 0.9665
No cut -9999.0000
Template id: HROW
-0.1099 12.4161
Template id: MCUT
-0.1099 0.1099
Template id: MFILL
-0.1099 -0.1099
Template id: VROW
-0.1099 1.6850

Station  at Station number 855.0000 and elevation 372.7755 and access distance 0.0000 and center 855.3651
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669383.5599 100060.9868 372.7755
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR 
Material name: GR
Interval for the levels is : [-0.1185,-0.1185]
-0.1185 with fill 0.0000 and cut 16.5468
No fill -9999.0000
Maximum volume cut is 12.2482
Template id: HROW
-0.1185 12.9818
Template id: MCUT
-0.1185 0.1185
Template id: MFILL
-0.1185 -0.1185
Template id: VROW
-0.1185 1.4371

Station  at Station number 855.7303 and elevation 372.7949 and access distance 0.0000 and center 857.8651
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669383.6050 100060.2579 372.7949
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR q3 SR 
Material name: GR
Interval for the levels is : [-0.1198,-0.1198]
-0.1198 with fill 0.0000 and cut 16.9970
No fill -9999.0000
Maximum volume cut is 77.1238
Material name: SR
Interval for the levels is : [-0.1198,-0.1198]
-0.1198 with fill 0.0000 and cut 0.0000
No fill -9999.0000
Maximum volume cut is 0.7707
Material name: q3
Interval for the levels is : [-0.1198,-0.1198]
-0.1198 with fill 0.0000 and cut 0.0000
Maximum volume fill is 0.0594
No cut -9999.0000
Template id: HROW
-0.1198 13.0662
Template id: MCUT
-0.1198 0.1198
Template id: MFILL
-0.1198 -0.1198
Template id: VROW
-0.1198 1.5216

Station  at Station number 860.0000 and elevation 372.8986 and access distance 0.0000 and center 862.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669383.8685 100055.9963 372.8986
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.1201,-0.1201]
-0.1201 with fill 0.0000 and cut 19.1289
No fill -9999.0000
Maximum volume cut is 101.1145
Material name: SR
Interval for the levels is : [-0.1201,-0.1201]
-0.1201 with fill 0.0000 and cut 0.3610
No fill -9999.0000
Maximum volume cut is 4.7765
Material name: q3
Interval for the levels is : [-0.1201,-0.1201]
-0.1201 with fill 0.0278 and cut 0.0000
Maximum volume fill is 0.0696
No cut -9999.0000
Template id: HROW
-0.1201 13.5247
Template id: MCUT
-0.1201 0.1201
Template id: MFILL
-0.1201 -0.1201
Template id: VROW
-0.1201 1.9800

Station  at Station number 865.0000 and elevation 373.0185 and access distance 0.0000 and center 867.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669384.1771 100051.0058 373.0185
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1266,-0.1266]
-0.1266 with fill 0.0000 and cut 21.3169
No fill -9999.0000
Maximum volume cut is 111.7789
Material name: SR
Interval for the levels is : [-0.1266,-0.1266]
-0.1266 with fill 0.0000 and cut 1.5496
No fill -9999.0000
Maximum volume cut is 11.5355
Template id: HROW
-0.1266 14.0677
Template id: MCUT
-0.1266 0.1266
Template id: MFILL
-0.1266 -0.1266
Template id: VROW
-0.1266 2.5231

Station  at Station number 870.0000 and elevation 373.1384 and access distance 0.0000 and center 872.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669384.4856 100046.0153 373.1384
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1416,-0.1416]
-0.1416 with fill 0.0000 and cut 23.3947
No fill -9999.0000
Maximum volume cut is 124.3793
Material name: SR
Interval for the levels is : [-0.1416,-0.1416]
-0.1416 with fill 0.0000 and cut 3.0646
No fill -9999.0000
Maximum volume cut is 19.4876
Template id: HROW
-0.1416 14.6613
Template id: MCUT
-0.1416 0.1416
Template id: MFILL
-0.1416 -0.1416
Template id: VROW
-0.1416 3.1167

Station  at Station number 875.0000 and elevation 373.2530 and access distance 0.0000 and center 877.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669384.7942 100041.0249 373.2530
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1594,-0.1594]
-0.1594 with fill 0.0000 and cut 26.3570
No fill -9999.0000
Maximum volume cut is 138.6731
Material name: SR
Interval for the levels is : [-0.1594,-0.1594]
-0.1594 with fill 0.0000 and cut 4.7304
No fill -9999.0000
Maximum volume cut is 27.3961
Template id: HROW
-0.1594 15.2394
Template id: MCUT
-0.1594 0.1594
Template id: MFILL
-0.1594 -0.1594
Template id: VROW
-0.1594 3.6948

Station  at Station number 880.0000 and elevation 373.3453 and access distance 0.0000 and center 882.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669385.1027 100036.0344 373.3453
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1635,-0.1635]
-0.1635 with fill 0.0000 and cut 29.1122
No fill -9999.0000
Maximum volume cut is 153.1828
Material name: SR
Interval for the levels is : [-0.1635,-0.1635]
-0.1635 with fill 0.0000 and cut 6.2280
No fill -9999.0000
Maximum volume cut is 35.5093
Template id: HROW
-0.1635 15.7100
Template id: MCUT
-0.1635 0.1635
Template id: MFILL
-0.1635 -0.1635
Template id: VROW
-0.1635 4.1654

Station  at Station number 885.0000 and elevation 373.4377 and access distance 0.0000 and center 887.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669385.4113 100031.0439 373.4377
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1759,-0.1759]
-0.1759 with fill 0.0000 and cut 32.1609
No fill -9999.0000
Maximum volume cut is 169.3756
Material name: SR
Interval for the levels is : [-0.1759,-0.1759]
-0.1759 with fill 0.0000 and cut 7.9757
No fill -9999.0000
Maximum volume cut is 44.8319
Template id: HROW
-0.1759 16.1822
Template id: MCUT
-0.1759 0.1759
Template id: MFILL
-0.1759 -0.1759
Template id: VROW
-0.1759 4.6375

Station  at Station number 890.0000 and elevation 373.5301 and access distance 0.0000 and center 892.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669385.7198 100026.0535 373.5301
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1966,-0.1966]
-0.1966 with fill 0.0000 and cut 35.5893
No fill -9999.0000
Maximum volume cut is 185.1921
Material name: SR
Interval for the levels is : [-0.1966,-0.1966]
-0.1966 with fill 0.0000 and cut 9.9570
No fill -9999.0000
Maximum volume cut is 52.8148
Template id: HROW
-0.1966 16.6381
Template id: MCUT
-0.1966 0.1966
Template id: MFILL
-0.1966 -0.1966
Template id: VROW
-0.1966 5.0935

Station  at Station number 895.0000 and elevation 373.5950 and access distance 0.0000 and center 897.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669386.0284 100021.0630 373.5950
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1982,-0.1982]
-0.1982 with fill 0.0000 and cut 38.4875
No fill -9999.0000
Maximum volume cut is 199.2038
Material name: SR
Interval for the levels is : [-0.1982,-0.1982]
-0.1982 with fill 0.0000 and cut 11.1689
No fill -9999.0000
Maximum volume cut is 57.7720
Template id: HROW
-0.1982 16.8850
Template id: MCUT
-0.1982 0.1982
Template id: MFILL
-0.1982 -0.1982
Template id: VROW
-0.1982 5.3404

Station  at Station number 900.0000 and elevation 373.6426 and access distance 0.0000 and center 902.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669386.3369 100016.0725 373.6426
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1908,-0.1908]
-0.1908 with fill 0.0000 and cut 41.1940
No fill -9999.0000
Maximum volume cut is 209.2921
Material name: SR
Interval for the levels is : [-0.1908,-0.1908]
-0.1908 with fill 0.0000 and cut 11.9399
No fill -9999.0000
Maximum volume cut is 62.2984
Template id: HROW
-0.1908 17.0232
Template id: MCUT
-0.1908 0.1908
Template id: MFILL
-0.1908 -0.1908
Template id: VROW
-0.1908 5.4786

Station  at Station number 905.0000 and elevation 373.6903 and access distance 0.0000 and center 907.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669386.6455 100011.0821 373.6903
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1918,-0.1918]
-0.1918 with fill 0.0000 and cut 42.5229
No fill -9999.0000
Maximum volume cut is 215.6204
Material name: SR
Interval for the levels is : [-0.1918,-0.1918]
-0.1918 with fill 0.0000 and cut 12.9795
No fill -9999.0000
Maximum volume cut is 68.3647
Template id: HROW
-0.1918 17.2068
Template id: MCUT
-0.1918 0.1918
Template id: MFILL
-0.1918 -0.1918
Template id: VROW
-0.1918 5.6622

Station  at Station number 910.0000 and elevation 373.7340 and access distance 0.0000 and center 912.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669386.9540 100006.0916 373.7340
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1972,-0.1972]
-0.1972 with fill 0.0000 and cut 43.7253
No fill -9999.0000
Maximum volume cut is 219.6227
Material name: SR
Interval for the levels is : [-0.1972,-0.1972]
-0.1972 with fill 0.0000 and cut 14.3664
No fill -9999.0000
Maximum volume cut is 75.0502
Template id: HROW
-0.1972 17.4004
Template id: MCUT
-0.1972 0.1972
Template id: MFILL
-0.1972 -0.1972
Template id: VROW
-0.1972 5.8557

Station  at Station number 915.0000 and elevation 373.7326 and access distance 0.0000 and center 917.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669387.2626 100001.1011 373.7326
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1659,-0.1659]
-0.1659 with fill 0.0000 and cut 44.1238
No fill -9999.0000
Maximum volume cut is 220.9523
Material name: SR
Interval for the levels is : [-0.1659,-0.1659]
-0.1659 with fill 0.0000 and cut 15.6536
No fill -9999.0000
Maximum volume cut is 80.0264
Template id: HROW
-0.1659 17.3928
Template id: MCUT
-0.1659 0.1659
Template id: MFILL
-0.1659 -0.1659
Template id: VROW
-0.1659 5.8482

Station  at Station number 920.0000 and elevation 373.7298 and access distance 0.0000 and center 922.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669387.5712 99996.1106 373.7298
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1413,-0.1413]
-0.1413 with fill 0.0000 and cut 44.2571
No fill -9999.0000
Maximum volume cut is 222.6577
Material name: SR
Interval for the levels is : [-0.1413,-0.1413]
-0.1413 with fill 0.0000 and cut 16.3569
No fill -9999.0000
Maximum volume cut is 83.6200
Template id: HROW
-0.1413 17.3405
Template id: MCUT
-0.1413 0.1413
Template id: MFILL
-0.1413 -0.1413
Template id: VROW
-0.1413 5.7959

Station  at Station number 925.0000 and elevation 373.7269 and access distance 0.0000 and center 927.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669387.8797 99991.1202 373.7269
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR 
Material name: GR
Interval for the levels is : [-0.1251,-0.1251]
-0.1251 with fill 0.0000 and cut 44.8060
No fill -9999.0000
Maximum volume cut is 224.5160
Material name: SR
Interval for the levels is : [-0.1251,-0.1251]
-0.1251 with fill 0.0000 and cut 17.0911
No fill -9999.0000
Maximum volume cut is 85.7044
Template id: HROW
-0.1251 17.3190
Template id: MCUT
-0.1251 0.1251
Template id: MFILL
-0.1251 -0.1251
Template id: VROW
-0.1251 5.7743

Station  at Station number 930.0000 and elevation 373.7102 and access distance 0.0000 and center 932.4147
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669388.1883 99986.1297 373.7102
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.1035,-0.1035]
-0.1035 with fill 0.0000 and cut 45.0004
No fill -9999.0000
Maximum volume cut is 216.6007
Material name: SR
Interval for the levels is : [-0.1035,-0.1035]
-0.1035 with fill 0.0000 and cut 17.1907
No fill -9999.0000
Maximum volume cut is 82.3354
Material name: q3
Interval for the levels is : [-0.1035,-0.1035]
-0.1035 with fill 0.0000 and cut 0.0000
Maximum volume fill is 0.0389
No cut -9999.0000
Template id: HROW
-0.1035 17.1774
Template id: MCUT
-0.1035 0.1035
Template id: MFILL
-0.1035 -0.1035
Template id: VROW
-0.1035 5.6328

Station  at Station number 934.8294 and elevation 373.6856 and access distance 0.0000 and center 934.9147
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669388.4863 99981.3095 373.6856
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0820,-0.0820]
-0.0820 with fill 0.0000 and cut 44.7006
No fill -9999.0000
Maximum volume cut is 7.6253
Material name: SR
Interval for the levels is : [-0.0820,-0.0820]
-0.0820 with fill 0.0000 and cut 16.9070
No fill -9999.0000
Maximum volume cut is 2.8844
Material name: q3
Interval for the levels is : [-0.0820,-0.0820]
-0.0820 with fill 0.0161 and cut 0.0000
Maximum volume fill is 0.0028
No cut -9999.0000
Template id: HROW
-0.0820 17.0032
Template id: MCUT
-0.0820 0.0820
Template id: MFILL
-0.0820 -0.0820
Template id: VROW
-0.0820 5.4585

Station  at Station number 935.0000 and elevation 373.6848 and access distance 0.0000 and center 937.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669388.4968 99981.1392 373.6848
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0814,-0.0814]
-0.0814 with fill 0.0000 and cut 44.6878
No fill -9999.0000
Maximum volume cut is 222.8945
Material name: SR
Interval for the levels is : [-0.0814,-0.0814]
-0.0814 with fill 0.0000 and cut 16.9051
No fill -9999.0000
Maximum volume cut is 84.4938
Material name: q3
Interval for the levels is : [-0.0814,-0.0814]
-0.0814 with fill 0.0167 and cut 0.0000
Maximum volume fill is 0.1243
No cut -9999.0000
Template id: HROW
-0.0814 16.9972
Template id: MCUT
-0.0814 0.0814
Template id: MFILL
-0.0814 -0.0814
Template id: VROW
-0.0814 5.4525

Station  at Station number 940.0000 and elevation 373.6593 and access distance 0.0000 and center 942.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669388.8054 99976.1488 373.6593
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0631,-0.0631]
-0.0631 with fill 0.0000 and cut 44.4700
No fill -9999.0000
Maximum volume cut is 221.7018
Material name: SR
Interval for the levels is : [-0.0631,-0.0631]
-0.0631 with fill 0.0000 and cut 16.8924
No fill -9999.0000
Maximum volume cut is 83.7362
Material name: q3
Interval for the levels is : [-0.0631,-0.0631]
-0.0631 with fill 0.0330 and cut 0.0000
Maximum volume fill is 0.1628
No cut -9999.0000
Template id: HROW
-0.0631 16.8227
Template id: MCUT
-0.0631 0.0631
Template id: MFILL
-0.0631 -0.0631
Template id: VROW
-0.0631 5.2781

Station  at Station number 945.0000 and elevation 373.6291 and access distance 0.0000 and center 947.5000
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669389.1139 99971.1583 373.6291
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0401,-0.0401]
-0.0401 with fill 0.0000 and cut 44.2107
No fill -9999.0000
Maximum volume cut is 218.9111
Material name: SR
Interval for the levels is : [-0.0401,-0.0401]
-0.0401 with fill 0.0000 and cut 16.6021
No fill -9999.0000
Maximum volume cut is 80.2934
Material name: q3
Interval for the levels is : [-0.0401,-0.0401]
-0.0401 with fill 0.0321 and cut 0.0000
Maximum volume fill is 0.1587
No cut -9999.0000
Template id: HROW
-0.0401 16.6941
Template id: MCUT
-0.0401 0.0401
Template id: MFILL
-0.0401 -0.0401
Template id: VROW
-0.0401 5.1495

Station  at Station number 950.0000 and elevation 373.5845 and access distance 0.0000 and center 950.1457
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669389.4225 99966.1678 373.5845
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0028,-0.0028]
-0.0028 with fill 0.0000 and cut 43.3537
No fill -9999.0000
Maximum volume cut is 12.6291
Material name: SR
Interval for the levels is : [-0.0028,-0.0028]
-0.0028 with fill 0.0000 and cut 15.5153
No fill -9999.0000
Maximum volume cut is 4.5120
Material name: q3
Interval for the levels is : [-0.0028,-0.0028]
-0.0028 with fill 0.0313 and cut 0.0000
Maximum volume fill is 0.0091
No cut -9999.0000
Template id: HROW
-0.0028 16.4356
Template id: MCUT
-0.0028 0.0028
Template id: MFILL
-0.0028 -0.0028
Template id: VROW
-0.0028 4.8910

Station  at Station number 950.2915 and elevation 373.5819 and access distance 0.0000 and center 950.2915
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: None!
Coordinates: 669389.4405 99965.8769 373.5819
Ref. elevation: -9999.0000
Interval for levels (when no station manager) [-9999.0000,-9999.0000]
Material present: GR SR q3 
Material name: GR
Interval for the levels is : [-0.0006,-0.0006]
-0.0006 with fill 0.0000 and cut 43.3067
No fill -9999.0000
No cut -9999.0000
Material name: SR
Interval for the levels is : [-0.0006,-0.0006]
-0.0006 with fill 0.0000 and cut 15.4460
No fill -9999.0000
No cut -9999.0000
Material name: q3
Interval for the levels is : [-0.0006,-0.0006]
-0.0006 with fill 0.0313 and cut 0.0000
No fill -9999.0000
No cut -9999.0000
Template id: HROW
-0.0006 16.4248
Template id: MCUT
-0.0006 0.0006
Template id: MFILL
-0.0006 -0.0006
Template id: VROW
-0.0006 4.8802

-----------------------------------------------------------------------
Pit manager:

Pit ArtPitBor0 at Station number 0.0000 and elevation -9999.0000 and access distance 0.0000 and center 0.0500
Default costs are: None! 

Specific costs are: 
Material GR has embankment cost 0.0000 and excavation cost 4.0000
Material SR has embankment cost 0.0000 and excavation cost 20.0000
Capacities are: 
Material name: GR
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Material name: SR
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Station index is: 0
Prep cost is: 0.0000
Artificial pit
Capacity in banked units
Borrow pit 

Pit ArtPitBor1 at Station number 950.2915 and elevation -9999.0000 and access distance 0.0000 and center 950.2915
Default costs are: None! 

Specific costs are: 
Material GR has embankment cost 0.0000 and excavation cost 4.0000
Material SR has embankment cost 0.0000 and excavation cost 20.0000
Capacities are: 
Material name: GR
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Material name: SR
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Station index is: 226
Prep cost is: 0.0000
Artificial pit
Capacity in banked units
Borrow pit 

Pit ArtPitWst0 at Station number 0.0000 and elevation -9999.0000 and access distance 0.0000 and center 0.0500
Default costs are: None! 

Specific costs are: 
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Capacities are: 
Material name: q1
Capacities: 
Borrow:0.0000, Waste: 1000000.0000
Station index is: 0
Prep cost is: 0.0000
Artificial pit
Capacity in banked units
Waste pit 

Pit ArtPitWst1 at Station number 950.2915 and elevation -9999.0000 and access distance 0.0000 and center 950.2915
Default costs are: None! 

Specific costs are: 
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Capacities are: 
Material name: q1
Capacities: 
Borrow:0.0000, Waste: 1000000.0000
Station index is: 226
Prep cost is: 0.0000
Artificial pit
Capacity in banked units
Waste pit 

Pit Pit1 at Station number 0.0000 and elevation -9999.0000 and access distance 0.0000 and center 0.0500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: 
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Capacities are: 
Material name: q1
Capacities: 
Borrow:0.0000, Waste: 1000000.0000
Station index is: 0
Prep cost is: 0.0000
User defined pit
Capacity in banked units
Waste pit 

Pit Pit2 at Station number 0.0000 and elevation -9999.0000 and access distance 0.0000 and center 0.0500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: 
Material OB has embankment cost 0.0000 and excavation cost 4.0000
Capacities are: 
Material name: OB
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Station index is: 0
Prep cost is: 0.0000
User defined pit
Capacity in banked units
Borrow pit 

Pit Pit3 at Station number 450.0000 and elevation -9999.0000 and access distance 2500.0000 and center 450.0500
Default costs are: 
Material GR has embankment cost 2.0000 and excavation cost 4.0000
Material GT has embankment cost 2.0000 and excavation cost 4.0000
Material OB has embankment cost 2.0000 and excavation cost 4.0000
Material SR has embankment cost 1.8000 and excavation cost 20.0000
Material q1 has embankment cost 0.0000 and excavation cost 0.0000
Material q2 has embankment cost 0.0000 and excavation cost 0.0000
Material q3 has embankment cost 0.0000 and excavation cost 0.0000
Material q4 has embankment cost 0.0000 and excavation cost 0.0000
Specific costs are: 
Material SR has embankment cost 0.0000 and excavation cost 6.0000
Capacities are: 
Material name: SR
Capacities: 
Borrow:1000000.0000, Waste: 0.0000
Station index is: 104
Prep cost is: 0.0000
User defined pit
Capacity in banked units
Borrow pit 

-----------------------------------------------------------------------
Cost manager:

Distance freehaul 250.0000, Distance overhaul  1500.0000
Movement cost freehaul 4.0000, Loading freehaul 0.0000
Movement cost overhaul 2.0000, Loading overhaul 0.5000
Movement cost endhaul 1.0000, Loading endhaul 2.0000
-----------------------------------------------------------------------
Model for network model.

New distances:

Distance freehaul 250.0000, Distance overhaul  1500.0000
-----------------------------------------------------------------------
Optimization parameters:

Maximum time (in secs) 0.0000, Integrality Gap (%) 0.0000, Nb solutions 0
NbThreads 0
Using CBC
CBC options: 128
Relative Gap
VA optimization
-----------------------------------------------------------------------
Direction (hard) :
From Stn -340282346638999980000000000000000000000.0000 Both
-----------------------------------------------------------------------
Location parameters:

Volume factor 1.0000, Volume unit Cu. m., Volume decimals 2, Volume tolerance 0.0100
Distance unit m., Distance decimals 3, Distance tolerance 0.0010
Slope unit %, Slope decimals 2, Slope tolerance 0.0100
K unit --, K decimals 2, K tolerance 0.1000
Cost decimals 2
Length Factor 0.0010